Confirmed users
1,062
edits
(Reworded the dot release steps to cover planned and unplanned dot releases) |
(update beta->release dry run documentation) |
||
| Line 433: | Line 433: | ||
==The following needs to be performed at the end of the Beta Cycle== | ==The following needs to be performed at the end of the Beta Cycle== | ||
# | # Schedule a mozilla-beta->mozilla-release migration dry run | ||
#* The job | #* The job can be scheduled in Ship-It from "Merge Automation > Firefox Desktop". | ||
#* | #* Verify the resulting diffs created by the graph. | ||
# Disable automated beta builds in Ship-it. | # Disable automated beta builds in Ship-it. | ||
# Please Note: Monitor beta/release uplift requests between the final beta build and the beta to release merge. It is possible that a late uplift request may come in for a regression/stability fix, evaluate if this is a blocker for the RC and if it should be uplifted to beta before the beta to release merge and RC build. | # Please Note: Monitor beta/release uplift requests between the final beta build and the beta to release merge. It is possible that a late uplift request may come in for a regression/stability fix, evaluate if this is a blocker for the RC and if it should be uplifted to beta before the beta to release merge and RC build. | ||
=iOS XXX.0 Checklist= | =iOS XXX.0 Checklist= | ||