Release Management/Release Process Checklist Documentation: Difference between revisions

Jump to navigation Jump to search
update beta->release dry run documentation
(Reworded the dot release steps to cover planned and unplanned dot releases)
(update beta->release dry run documentation)
Line 433: Line 433:


==The following needs to be performed at the end of the Beta Cycle==
==The following needs to be performed at the end of the Beta Cycle==
# Verfiy the automated mozilla-beta->mozilla-release migration no-op trial run
# Schedule a mozilla-beta->mozilla-release migration dry run
#* The job automatically runs every Friday and the link is shared on the [https://matrix.to/#/#releaseduty:mozilla.org #release-duty] channel in Matrix.
#* The job can be scheduled in Ship-It from "Merge Automation > Firefox Desktop".
#* See [https://moz-releng-docs.readthedocs.io/en/latest/how-to/releaseduty/merge-duty/merge_duty.html#mozilla-beta-mozilla-release-migration-no-op-trial-run #do-migration-no-op-trial-runs] for documentation.
#* Verify the resulting diffs created by the graph.
# Disable automated beta builds in Ship-it.
# Disable automated beta builds in Ship-it.
# Please Note: Monitor beta/release uplift requests between the final beta build and the beta to release merge. It is possible that a late uplift request may come in for a regression/stability fix, evaluate if this is a blocker for the RC and if it should be uplifted to beta before the beta to release merge and RC build.
# Please Note: Monitor beta/release uplift requests between the final beta build and the beta to release merge. It is possible that a late uplift request may come in for a regression/stability fix, evaluate if this is a blocker for the RC and if it should be uplifted to beta before the beta to release merge and RC build.


=iOS XXX.0 Checklist=
=iOS XXX.0 Checklist=
Confirmed users
1,062

edits

Navigation menu