Release Management/Release Process Checklist Documentation: Difference between revisions

Jump to navigation Jump to search
Removed early beta step
(Removed some nightly tasks)
(Removed early beta step)
Line 417: Line 417:
#* Review the Release Milestones section dates and update the status.
#* Review the Release Milestones section dates and update the status.
#* Update the Quality Metrics section to add information on the number of outstanding regressions, if there are any release blockers, and an overview on the trend of the Beta Quality Metrics metrics.
#* Update the Quality Metrics section to add information on the number of outstanding regressions, if there are any release blockers, and an overview on the trend of the Beta Quality Metrics metrics.
==The following needs to be performed at the End of Early Beta==
Please Note: This is performed on the Friday at the midway point of the beta cycle. This is typically after beta 5 has been released. This should be done before pushing any other uplifts to beta after beta 5.
# Submit a Early -> late beta merge automation with Dry Run disabled in Ship-it
# Start the Early -> late beta merge automation
After the job runs, verify that the commit was pushed to the mozilla-beta repo, see [https://hg.mozilla.org/releases/mozilla-beta/rev/29e6215562511ffef7bfa73bed97093ec3d8cdd4 example].


==The following needs to be performed at the end of the Beta Cycle==
==The following needs to be performed at the end of the Beta Cycle==
Line 717: Line 710:




=iOS XXX.1 - XXX.3 Checklist=
=iOS XXX.1 =


Perform the same steps as [https://wiki.mozilla.org/Release_Management/Release_Process_Checklist_Documentation#iOS_XXX.0_Checklist iOS XXX.0 Checklist] but with the following exceptions:
Perform the same steps as [https://wiki.mozilla.org/Release_Management/Release_Process_Checklist_Documentation#iOS_XXX.0_Checklist iOS XXX.0 Checklist] but with the following exceptions:
497

edits

Navigation menu