497
edits
Diannasmith (talk | contribs) |
(Clarify QA sign-off expectations for beta) |
||
| Line 308: | Line 308: | ||
==Monitor for QA sign-offs on beta 1 build 2 == | ==Monitor for QA sign-offs on beta 1 build 2 == | ||
QA sign-offs are usually provided the day after build 2 is ready | QA sign-offs are usually provided the day after build 2 is ready | ||
# Monitor for QA testing signoff for Desktop | # Monitor for QA testing signoff for Desktop | ||
#* QA will post a message to the | #* QA will post a message to the # qa-coordination channel in Slack when they complete functional testing. | ||
# Monitor for QA sign-off on Fenix/Focus build validation | # Monitor for QA sign-off on Fenix/Focus build validation | ||
#* Fenix build validation testing is tracked [https://mozilla-hub.atlassian.net/wiki/spaces/MTE/pages/21561505 here] | #* Fenix build validation testing is tracked [https://mozilla-hub.atlassian.net/wiki/spaces/MTE/pages/21561505 here] | ||
edits