Calendar:Release Build Instructions: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
Line 42: Line 42:
* At this stage, the master should show that the "tag" builder either has a build pending, or is running.
* At this stage, the master should show that the "tag" builder either has a build pending, or is running.
* It is a good idea to check the comm-* and mozilla-* repositories during/after tagging to ensure the correct thing has been tagged and version bump is correct.
* It is a good idea to check the comm-* and mozilla-* repositories during/after tagging to ensure the correct thing has been tagged and version bump is correct.
== Post Build Step ==
* Log into the 32 bit Linux box
* Run TBD to unify the Linux builds
* Test the Lightning builds in the nightly/*-candidates directory
* Upload to AMO
canmove, Confirmed users, Bureaucrats and Sysops emeriti
3,628

edits

Navigation menu