Release Management/Road to Mobile Beta 11: Difference between revisions

Jump to navigation Jump to search
Line 218: Line 218:
''include any work you're still hoping to land during beta''
''include any work you're still hoping to land during beta''
|
|
Setup:
* Done:
** J-PAKE and fallback setup
** Bidirectional pairing
* Aiming to land before beta uplift:
** Android compatibility (v8 and earlier, {{bug|717691}}).
** UI tweaking ({{bug|718242}}).
* Will not land:
** Editing/correcting credentials.
** Notification for incorrect credentials.
Core:
* Done:
** Enough to deliver something that looks like bidirectional syncing.
* Aiming to land before beta uplift:
** Likely to get clients engine, backoff handling, and basic reset handling done.
* Will not land:
** A complete and thorough Sync implementation.
Bookmarks:
* Done:
** Basic syncing of regular bookmarks and folders.
* Aiming to land before beta uplift:
** Extensive improvements for reliability ({{bug|718238}}).
* Cannot implement:
** Queries, microsummaries, livemarks…
* Will not land:
** Favicon sync.
History:
* Done:
** Pretty much complete. Not tested with history pruning in effect.
During beta:
* Improvements and fixes only. No major features planned to land.
|-
|-
|Blocking bugs:
|Blocking bugs:
|
|
* {{bug|1}}
* {{bug|718493}} — tracking bug for Aurora uplift in late Jan. Not committing to any other work.
* {{bug|2}}
|-
|-
|Blocking work:
|Blocking work:
Line 239: Line 274:
''engineering, QA, test audiences''
''engineering, QA, test audiences''
|
|
* We plan to request testing from the MTD audience once landed on beta, as they've been excited to start testing  
* We plan to request testing from the MTD audience once landed on beta, as they've been excited to start testing.
* Services QA is performing regular testing of builds.
|-
|-
|Estimated testing completion date:
|Estimated testing completion date:
Line 253: Line 289:
|-
|-
|Points of Contact:
|Points of Contact:
| Ally
|Ally
|-
|-
|style="width: 30%;"|State of feature on 1/31:
|style="width: 30%;"|State of feature on 1/31:
''include any work you're still hoping to land during beta''
''include any work you're still hoping to land during beta''
|
|
Some basic work on passwords engine done, untested and not integrated.
Blocked on Fennec content provider for passwords ({{bug|704682}}). If that gets done, integrated, and works, we might get {{bug|709385}} done by the end of January. Otherwise it'll get done when it gets done.
No Sync-side work done on tabs ({{bug|709403}}). Blocked on design, spec, and implementation of Fennec tab interfaces ({{bug|715644}}). Nothing will land this quarter.
|-
|-
|Blocking bugs:
|Blocking bugs:
|
|
* {{bug|1}}
* {{bug|709385}}
* {{bug|2}}
* {{bug|704682}}
|-
|-
|Blocking work:
|Blocking work:
''untracked in Bugzilla''
|
|
* Blocking work goes here
|-
|-
|Estimated landing date on m-c:
|Estimated landing date on m-c:
|
|When done.
|-
|-
|Estimated uplift date to Aurora:
|Estimated uplift date to Aurora:
Line 278: Line 317:
''engineering, QA, test audiences''
''engineering, QA, test audiences''
|
|
* Services QA
* MTD
|-
|-
|Estimated testing completion date:
|Estimated testing completion date:
Line 286: Line 327:
|}
|}
<br><br>
<br><br>


= AMO Support =
= AMO Support =
canmove, Confirmed users
640

edits

Navigation menu