Auto-tools/Goals/2013Q2: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 5: Line 5:
** [[Auto-tools/Projects/Bugzilla_2013Q2|Improve patch review experience on bugzilla/Make bugzilla more user-centric]]
** [[Auto-tools/Projects/Bugzilla_2013Q2|Improve patch review experience on bugzilla/Make bugzilla more user-centric]]
** [[Auto-tools/Projects/SfN_2013Q2|Replace graph server with Datazilla for all desktop Talos tests]]
** [[Auto-tools/Projects/SfN_2013Q2|Replace graph server with Datazilla for all desktop Talos tests]]
** Release a v1 "bisect in the cloud" for linux tests
*** TODO: define specific user scenario we are going to design this for
** Create a project branch view of B2G builds/tests that tracks commits per target, rather than per repo (all commits to any repo for unagi for instance) joint with releng
** Create a project branch view of B2G builds/tests that tracks commits per target, rather than per repo (all commits to any repo for unagi for instance) joint with releng


* '''Goal:''' Improve stability, reliability, and scalability of automation platforms by:
* '''Goal:''' Improve stability, reliability, and scalability of automation platforms by:
** [[Auto-tools/Projects/B2G_Automation|Addressing all P1 B2G automation stability issues]] TODO: buglist?
** [[Auto-tools/Projects/B2G_Automation|Addressing all P1 B2G automation stability issues]]
** [[Auto-tools/Projects/Bugzilla_2013Q2|Complete native REST interface for Bugzilla]]
** [[Auto-tools/Projects/Bugzilla_2013Q2|Complete native REST interface for Bugzilla]]
** [[Auto-tools/Projects/Mochitest_on_Mozbase|Complete Mochitest to Mozbase port]] P1 bugs TODO: buglist
** [[Auto-tools/Projects/Mochitest_on_Mozbase|Complete Mochitest to Mozbase port]] P1 bugs  
** Create Microbenchmark suite
** Create Microbenchmark suite
*** TODO: work with lmandel to decide what perf features need attention, microBenchmarks might be scratchings on a wall and offered up as a community project
*** TODO: work with lmandel to decide what perf features need attention, microBenchmarks might be scratchings on a wall and offered up as a community project
** Drive developer investigation into the top 20 intermittent failures in automation and drive solutions where possible.
** Reduce orange factor to 5 or lower by driving awareness among developers, following up with assignees, and fixing intermittent automation failures.
** Update pulse so that its dependent (client side) libraries are current TODO: buglist
** Update pulse so that its dependent (client side) libraries are current
** Create a prototype and a specification for a rig to power cycle real phones. Have a vendor selected to build the rig by end of quarter.
** Create a prototype and a specification for a rig to power cycle real phones. Have a vendor selected to build the rig by end of quarter.


* '''Goal:''' Build toward our future by:
* '''Goal:''' Build toward our future by:
** Deploy a minimally viable TBPL replacement by end of quarter, aim to switch over mid-Q3
** [[Auto-tools/Projects/TreeHerder_2013Q2|Deploy a minimally viable TBPL replacement by end of quarter, aim to switch over mid-Q3]]
** Release a mozmill 2 and work with contributor community to drive toward a 2.1
** [[Auto-tools/Projects/Mozmill_2.0_2013Q2|Release a mozmill 2 and work with contributor community to drive toward a 2.1]]
** Automate a scrolling fps test using camera Eideticker measurements for Contacts, Email, Settings, and Message apps
** Automate a scrolling fps test using camera Eideticker measurements for Contacts, Email, Settings, and Message apps
** Create and Deploy BMO user profile data for community building and education
** [[Auto-tools/Projects/Bugzilla_2013Q2|Create and Deploy BMO user profile data for community building and education]]
** Revamp Testday/Bugday efforts to drive community growth in our QA/Dev/Triage teams
** [[Auto-tools/Projects/Bugmaster_2013Q2|Create a solid net and filter system to build a bugmaster community]]
** Address P1 low hanging fruit of releng infrastructure load issues (joint with releng) TODO: List
** [[Auto-tools/Projects/Infaload_2013Q2|Identify 5 things we can do to increase our infrastructure capacity by 10% through more streamlined usage and bringing new capacity online. (joint with releng)]]
** Add x86 Android devices to Autophone
** [[Auto-tools/Projects/Androidx86_2013Q2|Enable performance and test automation to run on Android x86 hardware.]]
*** TODO: get specific here, there is a lot of unknowns
Confirmed users
3,816

edits

Navigation menu