Confirmed users
3,816
edits
No edit summary |
|||
| Line 10: | Line 10: | ||
=== Milestone 1 - 2 weeks (ending april 12) === | === Milestone 1 - 2 weeks (ending april 12) === | ||
* [Bug List: ] | * [Bug List: ] | ||
* Create email list for results from datazilla | * {{done|Create email list for results from datazilla}} | ||
* Wire emailing to that ^ list into the talos emailer (analyze_talos.py) now | * Wire emailing to that ^ list into the talos emailer (analyze_talos.py) now | ||
* Create schema and data service for generating the relevant time course data for comparisons of: | * Create schema and data service for generating the relevant time course data for comparisons of: | ||
| Line 21: | Line 21: | ||
* Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others) | * Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others) | ||
** Understand if we need per-page optimizations as well for pages within pagesets (we likely do). | ** Understand if we need per-page optimizations as well for pages within pagesets (we likely do). | ||
* Analyze why we seem to not get data at times from certain platform/tree combinations. | * {{done|Analyze why we seem to not get data at times from certain platform/tree combinations.}} | ||
=== Milestone 2 - 2 weeks (planned) === | === Milestone 2 - 2 weeks (planned) === | ||