Auto-tools/Projects/SfN 2013Q2: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 10: Line 10:
=== Milestone 1 - 2 weeks (ending april 12) ===
=== Milestone 1 - 2 weeks (ending april 12) ===
* [Bug List: ]
* [Bug List: ]
* Create email list for results from datazilla
* {{done|Create email list for results from datazilla}}
* Wire emailing to that ^ list into the talos emailer (analyze_talos.py) now
* Wire emailing to that ^ list into the talos emailer (analyze_talos.py) now
* Create schema and data service for generating the relevant time course data for comparisons of:
* Create schema and data service for generating the relevant time course data for comparisons of:
Line 21: Line 21:
* Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others)
* Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others)
** Understand if we need per-page optimizations as well for pages within pagesets (we likely do).
** Understand if we need per-page optimizations as well for pages within pagesets (we likely do).
* Analyze why we seem to not get data at times from certain platform/tree combinations.
* {{done|Analyze why we seem to not get data at times from certain platform/tree combinations.}}


=== Milestone 2 - 2 weeks (planned) ===
=== Milestone 2 - 2 weeks (planned) ===
Confirmed users
3,816

edits

Navigation menu