| Line 6: | Line 6: | ||
==Firefox Metro== | ==Firefox Metro== | ||
<p> </p> | <p> </p> | ||
* '''Total Goals:''' | * '''Total Goals:''' 17 | ||
* '''Completed Goals:''' 6 | * '''Completed Goals:''' 6 | ||
* '''Missed Goals:''' 0 | * '''Missed Goals:''' 0 | ||
| Line 13: | Line 13: | ||
* Develop a revised Metro Software Requirements Specification outlining a new version of the Minimum Viable Product (MVP) feature set. | * Develop a revised Metro Software Requirements Specification outlining a new version of the Minimum Viable Product (MVP) feature set. | ||
** '''{{done|}}''' Completed at the end of Iteration #5 on April 16. Product Manager review of V1 Release List resulted in the removal of 9 Feature Stories to V2. | ** '''{{done|}}''' Completed at the end of Iteration #5 on April 16. Product Manager review of V1 Release List resulted in the removal of 9 Feature Stories to V2. | ||
* Conduct a review of the current Metro Build and determine those legacy features to 'turn off' as they were never intended to be included as part of the V1 release. | |||
* Conduct a review of the Story Backlog and revise the priority levels of feature stories. | * Conduct a review of the Story Backlog and revise the priority levels of feature stories. | ||
** '''{{done|}}''' At the conclusion of Iteration #6, the Product Manager revised the priority levels of the feature stories in the Story Backlog. The revision resulted in: | ** '''{{done|}}''' At the conclusion of Iteration #6, the Product Manager revised the priority levels of the feature stories in the Story Backlog. The revision resulted in: | ||