FirefoxOS/DeviceQA/2015-02-09WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(update Al's weekly report)
No edit summary
Line 126: Line 126:
||
||
* Week W07 (02/09~02/13)
* Week W07 (02/09~02/13)
 
** V2.2 Cgroup
*** Design test cases for cgroup testing
** V2.2 Bluedroid
*** RD will run tests before FL, QA will start testing after FL
** Organize new hire's guide
||
||
* Week W08 (02/16~02/20)
* Week W08 (02/16~02/20)
** V2.2 Cgroup
*** Draft test plan for cgroup testing
*** Send test plan to RD for comment/review
*** Research possible failure scenarios in bugzilla
*** Write test cases in MozTrap
** V2.2 Bluedroid
*** RD will run tests before FL, QA will start testing after FL
** Organize new hire's guide


|-
|-

Revision as of 08:42, 16 February 2015

Last week | Next week

Name Done Plan
Al
  • Week W07 (02/09~02/13)
    • MCTS v2.2
      • implement device handler
      • migrate architecture
    • Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
  • Week W08 (02/16~02/20)
    • MCTS v2.2
    • Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
    • Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
Alison
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Askeing
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Cynthia
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Edward
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Eric
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Gerry
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Hermes
  • Week W07 (02/09~02/13)
    • Handle [E.Me Transition] tasks
    • Keep L porting test on nexus 5
    • Review NFC Test cases
    • Monitor v2.2+ System FE Bugs
      • Create test cases for short_name support on FxOS (Bug 1001861)
      • Perform QA sign off for Task Manager features
  • Week W08 (02/16~02/20)
    • Handle [E.Me Transition] tasks
    • Monitor v2.2+ System FE Bugs
      • Perform QA sign off for App-grouping, Smart Collections, and Rocketbar & Search Suggestions features.
Hubert
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Mike
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Owen Ouyang
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Paul
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Shing
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Teri
  • Week W07 (02/09~02/13)
    • V2.2 Cgroup
      • Design test cases for cgroup testing
    • V2.2 Bluedroid
      • RD will run tests before FL, QA will start testing after FL
    • Organize new hire's guide
  • Week W08 (02/16~02/20)
    • V2.2 Cgroup
      • Draft test plan for cgroup testing
      • Send test plan to RD for comment/review
      • Research possible failure scenarios in bugzilla
      • Write test cases in MozTrap
    • V2.2 Bluedroid
      • RD will run tests before FL, QA will start testing after FL
    • Organize new hire's guide
Walter
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
William Hsu
  • Week W07 (02/09~02/13)
    • [Device] Assist Dolphin v2.1 related stuff.
      • Bug triage and meetings
      • Performance measurement
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Gaia UI test on v2.1 Build
    • [Device][Outsourcing]
      • Troubleshooting for automation fail cases
      • Assist performance test
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
  • Week W08 (02/16~02/20)
    • [Device][Outsourcing]
      • Troubleshooting for automation fail cases
      • Assist performance test
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
      • PTO on 02/17
      • Chinese New Year. (2/18~2/23)