Platform/Roadmap: Difference between revisions
< Platform
Jump to navigation
Jump to search
(→JavaScript: Changed headings to break out Q3/Q4) |
(→Layout: Moved current plan to previous and changed headings.) |
||
| Line 317: | Line 317: | ||
* CSS scroll snapping | * CSS scroll snapping | ||
* CSS Ruby | * CSS Ruby | ||
------ Items above done before or during Q1 ------ | |||
------ Items above | |||
* Images downscale during decode for APZC platforms | * Images downscale during decode for APZC platforms | ||
| Line 328: | Line 327: | ||
------ Items above | ------ Items above done before or during Q2 ------ | ||
* | * | ||
------ Items above planned to be done before or during | ------ Items above planned to be done before or during Q3 ------ | ||
------ Items above planned to be done before or during Q4 ------ | |||
------ Items above planned to be done before | |||
| style="vertical-align:top;" | | | style="vertical-align:top;" | | ||
* Enable OMT Animations on all OMTC platforms | * Enable OMT Animations on all OMTC platforms | ||
* -webkit CSS compatibility for fix-list sites | * -webkit CSS compatibility for fix-list sites | ||
* Vertical Text (basic text, form controls) | * Vertical Text (basic text, form controls) | ||
* CSS Font Loading | * CSS Font Loading | ||
| Line 351: | Line 342: | ||
* CSS display:contents | * CSS display:contents | ||
* CSS scroll snapping | * CSS scroll snapping | ||
* CSS Ruby | |||
------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ||
* Images downscale during decode for APZC platforms | |||
* Web Animation API | * Web Animation API | ||
* HTML5 <canvas> improvements | * HTML5 <canvas> improvements | ||
* e10s Layout Support | * e10s Layout Support | ||
* Vertical Text (tables) | * Vertical Text (tables) | ||
* CSS 3D Transforms ( | * CSS 3D Transforms ( DEAA & VR requirements ) | ||
------ Items above planned to be done before or during Gecko 42 (Q2) ------ | ------ Items above planned to be done before or during Gecko 42 (Q2) ------ | ||
| Line 367: | Line 360: | ||
* CSS Box Alignment (for block layout) | * CSS Box Alignment (for block layout) | ||
* CSS Grid | * CSS Grid | ||
* CSS 3D Transforms ( plane splitting) | |||
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ||
Revision as of 19:28, 15 July 2015
| Firefox Platform 2015 Roadmap | ||
| Owner: Martin Best | Updated: 2015-07-15 | |
| This roadmap outlines the current direction for Firefox Platform development through 2015. The following document is subject to change at anytime. It is also not a commitment to ship a features but rather an intent to implement and land them on by default in the nightly version of Firefox unless otherwise stated. | ||
Related Links:
Teams
Accessibility
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
[everything below not finalized]
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
DOM
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
e10s
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Q1 ------ ------ Items above planned to be done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
Graphics
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
JavaScript
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Layout
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
------ Items above planned to be done before end 2015 but may get reprioritized ------ |
Media
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Mobile Platform
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Networking
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
PKI
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
|
|
Sandboxing
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Security
| Current Plans | Previous Plans |
|---|---|
------ Items above were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
WebRTC / WebAudio
(All these features/fixes below are landing in Nightly during these quarters)
| Current Plans | Previous Plans |
|---|---|
------ Items were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Web Compatibility
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Initiatives
- 60fps
- Focused on producing a smooth, jank free experiences. 60fps goal is dependant on media type.
- BarrierSmash
- Ensure that accessibility features are working throughout our products.
- Candle
- Program targeted at reducing energy usage.
- CrashKill
- Improve the overall stability of Gecko and the project that rely on it.
- CritSmash
- Fix known critical security bugs.
- Electrolysis
- This is focused on providing multi-process browser (aka e10s).
- Offline
- Offline Support
- Presto
- Program targeted at improving overall load times and performance. This is resurrecting an older program that was discontinued.
- MemShrink
- Reduce memory usage (all products)
- Web Compatibility
- Improve the overall web compatibility of Gecko.
- Webify
- Reduce the webs dependence on plugins. This includes several content targeted initiatives such as the games program (Unity), Shumway (Flash), MSE/EME, WebRTC (Google Talk, Facebook Video)
- Games Program