FirefoxOS/NGA: Difference between revisions
Jump to navigation
Jump to search
(Created page with "<div style="float: right; margin: 0px 0px 10px 25px;">link=</div> =='''Program Description'''== Enter text here ===Product Requirements:=== Enter text...") |
|||
| Line 157: | Line 157: | ||
|- | |- | ||
| EPM | | EPM | ||
| | | Maria Oteo | ||
| | | mariaoteo | ||
|- | |- | ||
| EM | | EM | ||
| | | Francisco Jordano | ||
| | | francisco | ||
|- | |- | ||
| PM | | PM | ||
| | | David Scravaglieri | ||
| | | scravag | ||
|- | |- | ||
| TL | | TL | ||
| | | | ||
| | | | ||
|- | |- | ||
| Line 189: | Line 189: | ||
---- | ---- | ||
==UX Specs== | ==UX Specs== | ||
---- | ---- | ||
==Reference Links== | ==Reference Links== | ||
Revision as of 02:17, 13 November 2015

Program Description
Enter text here
Product Requirements:
Enter text here
User Stories and Acceptance Criteria
| Title | BUG ID | User story | Acceptance Criteria |
|---|---|---|---|
| Title Goes Here | Bug ID | User Story 1 | Acceptance Criteria 1 |
| Bug ID | User Story 2 | Acceptance Criteria 2 | |
| Help/Onboarding | Bug ID | User Story 3 | Acceptance Criteria 3 |
Program Status
| Milestone | Date | Status |
|---|---|---|
| Milestone 1 | ON TARGET | |
| Milestone 2 | CHALLENGED | |
| Milestone 3 | AT RISK |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | Maria Oteo | mariaoteo |
| EM | Francisco Jordano | francisco |
| PM | David Scravaglieri | scravag |
| TL | ||
| UX | ||
| QA |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance

