Kill Switch: Difference between revisions
Jump to navigation
Jump to search
Full Query
(2.6 Requirements) |
|||
| Line 2: | Line 2: | ||
=='''Program Description'''== | =='''Program Description'''== | ||
'Kill Switch' is | 'Kill Switch' is an FMD action that lets a user lock and factory reset a lost or stolen device. | ||
===Product Requirements:=== | ===Product Requirements:=== | ||
| Line 21: | Line 21: | ||
| See US regulations attached to the bug | | See US regulations attached to the bug | ||
|- | |- | ||
|rowspan=" | |rowspan="2" | 2.6 Requirements | ||
| | | | ||
| | | | ||
| Acceptance Criteria | | Acceptance Criteria | ||
|- | |- | ||
| | | | ||
| | | | ||
| Acceptance Criteria | | Acceptance Criteria | ||
|- | |- | ||
Revision as of 20:45, 17 November 2015

Program Description
'Kill Switch' is an FMD action that lets a user lock and factory reset a lost or stolen device.
Product Requirements:
Kill Switch Partner Requirements
Kill Switch Red Tai Requirements
User Stories and Acceptance Criteria
| Title | BUG ID | User story | Acceptance Criteria |
|---|---|---|---|
| US Regulations | 119046 | Meta Bug | See US regulations attached to the bug |
| 2.6 Requirements | Acceptance Criteria | ||
| Acceptance Criteria |
Program Status
| Milestone | Date | Status |
|---|---|---|
| Red Tai FL | December 15, 2015 | AT RISK |
Status Key
| Color | Status | Key |
|---|---|---|
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. |
Program Timeline
MVP Scope
Querying Red Tai Feature Status
| ID | Summary | Status | Target milestone | Resolution | Assigned to | Depends on | Blocks | Whiteboard | Feature b2g |
|---|---|---|---|---|---|---|---|---|---|
| 1181561 | Exposing a kill switch enabling/disabling API | RESOLVED | FxOS-S6 (04Sep) | FIXED | :gerard-majax | 1146713, 1193677 | 1084540, 1175620, 1181505 | [systemsfe] | 2.2r+ |
1 Total; 0 Open (0%); 1 Resolved (100%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | Michael Treese | mtreese |
| EM | ||
| PM | Vishwanathan Krishnamoorthy (Vishy) | vishy |
| TL (Lock Screen) | Greg Weng | snowmantw |
| TL (Gecko [FMD Client]) | Alexandre Lissy | gerard-majax |
| UX | Jacqueline Savory | jsavory |
| QA | tbd |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance

