Breakpad/Status Meetings/2017-01-18: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 46: Line 46:


=== e2e tests ===
=== e2e tests ===
* yet to merge matt's latest updates
* matt is ready to merge
** pending verification by a second part
* open work/questions
** autorunning was moved outside the scope
** no expected progress until Peter returns
*** waiting to check in the solution works for peter
*** works for willkg now
* calling it done! woo hoo
=== Processor rewrite ===
=== Processor rewrite ===
* no progress
* no progress
Line 54: Line 64:
** https://bugzilla.mozilla.org/show_bug.cgi?id=1322630
** https://bugzilla.mozilla.org/show_bug.cgi?id=1322630
* updated to most recent compatible versions of our libraries after Will's suggestion
* updated to most recent compatible versions of our libraries after Will's suggestion
* Miles suggested a few plans, plan #1 (stop processors and cutover) should be pretty good
** Adrian and Miles will come up with a plan


== Other Business ==
== Other Business ==
* Miles wants to drop an index
** go for it!


== Travel, etc ==
== Travel, etc ==
Line 61: Line 75:
* WillKG on PTO January 26th and 27th.
* WillKG on PTO January 26th and 27th.
* Adrian out on Monday, Jan 23 but working on Friday, Jan 27 (switching my weekly day off).
* Adrian out on Monday, Jan 23 but working on Friday, Jan 27 (switching my weekly day off).
* Mbrandt afk 1/20
* Lonnen afk 19-23, limited availability 24,25


== Links ==
== Links ==

Latest revision as of 18:50, 18 January 2017

« previous meetingindexnext week » create?

Meeting Info

Breakpad status meetings occur on Wed at 10:00am Pacific Time.

Conference numbers:

   Vidyo: Stability 
   650-903-0800 x92 conf 98200#
   800-707-2533 (pin 369) conf 98200# 

IRC backchannel: #breakpad
Mountain View: Dancing Baby (3rd floor)

Operations Updates

  • prod deploy
  • stage is back to CD
    • it worked yesterday
    • nothing broke overnight
    • runs based on the deployed sha

Project Updates

Deployment Triage

PR Triage


Major Projects

Splitting out collector (Antenna)

  • (miles) Got system tests running via puppet in the -dev environment with logs going to S3.
  • (willkg) Fixed some issues with the antenna system tests.
  • (willkg) Figured out the mystery that was upload_file_minidump2.
  • (willkg) Improved the cli nature of the mini-poster module allowing me to compare output of socorro-collector vs. antenna with real crashes.

Deprecation rampage

  • Coming soon to a theater near you™

e2e tests

  • yet to merge matt's latest updates
  • matt is ready to merge
    • pending verification by a second part
  • open work/questions
    • autorunning was moved outside the scope
    • no expected progress until Peter returns
      • waiting to check in the solution works for peter
      • works for willkg now
  • calling it done! woo hoo

Processor rewrite

  • no progress
  • expecting some updates tomorrow and monday

Upgrading elasticsearch

  • discussion about a migration plan is going on
  • updated to most recent compatible versions of our libraries after Will's suggestion
  • Miles suggested a few plans, plan #1 (stop processors and cutover) should be pretty good
    • Adrian and Miles will come up with a plan

Other Business

  • Miles wants to drop an index
    • go for it!

Travel, etc

  • WillKG on PTO January 26th and 27th.
  • Adrian out on Monday, Jan 23 but working on Friday, Jan 27 (switching my weekly day off).
  • Mbrandt afk 1/20
  • Lonnen afk 19-23, limited availability 24,25

Links