Breakpad/Status Meetings/2017-05-10: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(→‎Operations Updates: ops updates)
Line 56: Line 56:
* Symbol download is now able to record all missing symbols
* Symbol download is now able to record all missing symbols
** ...and generate the .csv file Ted needs
** ...and generate the .csv file Ted needs
***
*** https://bugzilla.mozilla.org/show_bug.cgi?id=1361809


== Other Business ==
== Other Business ==

Revision as of 17:12, 10 May 2017

« previous meetingindexnext week » create?

Meeting Info

Breakpad status meetings occur on Wed at 10:00am Pacific Time.

Conference numbers:

   Vidyo: Stability 
   650-903-0800 x92 conf 98200#
   800-707-2533 (pin 369) conf 98200# 

IRC backchannel: #breakpad
Mountain View: Dancing Baby (3rd floor)

Operations Updates

  • really good news about why our elasticsearch is sad. that's super exciting. hopefully that pans out. if not, we will buy some big hammers.
  • there's some re-prioritization in ops, so might have more time to migrate socorro.
  • moved houses and had a lot of "fun".
  • symbols stuff is working: logging and all the things are in place. one hiccup with system tests, but whatevs.
  • prototyping on elasticsearch migration. has a call with aws support and will find out if there's a better way to move the data.
    • if we don't have reindex-by-remote, we think it'll take hours. maybe 8-12 hours of total time?
  • talked with aws about replicating s3 buckets. more news on that soon.

Project Updates

Deployment Triage

PR Triage

Major Projects

Deprecation rampage

  • (Adrian) stopped running useless cron jobs on stage and prod, and removed associated code

Processor rewrite

  • (willkg): continued working on the project plan and fleshing out open questions

Upgrading elasticsearch

Symbol Server 2017

Other Business

  • (chartjes) Is the dev team going to start working on the Swagger spec to help QA with API testing?

Travel, etc

Links