L10n:Weekly/2012-12-05: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
No edit summary
Line 43: Line 43:


Brief summary of interactions with the team from the past week:
Brief summary of interactions with the team from the past week:
Mozcamp: It seems we have a problem with-in the local community. The team needs restructuring and further
interaction: Planning sprint Jan 2013 if I can make it there.


Action items (provide assignments):
Action items (provide assignments):

Revision as of 16:26, 3 December 2012


Meeting Details

  • Time and location: Wednesday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel


« previous meeting — index – next week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.

Action Items

carry-overs


New locales updates

Burmese (my)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week: Mozcamp: It seems we have a problem with-in the local community. The team needs restructuring and further interaction: Planning sprint Jan 2013 if I can make it there.


Action items (provide assignments):

Malay (ms)

dashboard

Current build channel:

Blocks to release: On Track: 130 strings remaining. Duplicate Access Keys to be resolved. Localize: Intl.properties: https://bugzilla.mozilla.org/show_bug.cgi?id=784217

Brief summary of interactions with the team from the past week: Interactions with Syafiq and team over Mozmy FB page Commits to repo: Fixing two bugs (fonts.dtd, languageNames.properties)


Action items (provide assignments): Need help resolve #784217 and commits on other blocker bugs for this locale

Mongolian (mn)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Northern Sotho (nso)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Songhay (son)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Urdu (ur)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Azerbaijan (az)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week: Ismet requests some updates on this. We are still blocked by narro bugs.


Action items (provide assignments):

Samoan (sm)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Dywane gives a heads-up that the team is demoralized by the delay

Action items (provide assignments):


Tagalog (tl-PH)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments): Upcoming Sprint Dec 29

Lao (lo)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Sundanese (su-id)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week: Mozcamp: Sundanese L10N feels the translation is difficult. Need further feedback.


Action items (provide assignments):

Project updates

Mozilla.org

AMO

MDN

SUMO

QA

Other engagement projects

Labs

Infrastructure

Tools / L20n

Grow Mozilla