L10n:Weekly/2012-12-05: Difference between revisions
(Removed few locales) |
No edit summary |
||
| Line 120: | Line 120: | ||
Brief summary of interactions with the team from the past week: | Brief summary of interactions with the team from the past week: | ||
Moved to Pootle. Dwayne to create new review request. | |||
Action items (provide assignments): | Action items (provide assignments): | ||
Revision as of 15:57, 5 December 2012
Meeting Details
- Time and location: Wednesday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting —
index –
next week »
create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
Action Items
carry-overs
New locales updates
Burmese (my)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week: Mozcamp: It seems we have a problem with-in the local community. The team needs restructuring and further interaction: Planning sprint Jan 2013 if I can make it there.
Action items (provide assignments):
Malay (ms)
Current build channel:
Blocks to release: On Track: 130 strings remaining. Duplicate Access Keys to be resolved. Localize: Intl.properties: https://bugzilla.mozilla.org/show_bug.cgi?id=784217
Brief summary of interactions with the team from the past week: Interactions with Syafiq and team over Mozmy FB page Commits to repo: Fixing two bugs (fonts.dtd, languageNames.properties)
Action items (provide assignments):
Need help resolve #784217 and commits on other blocker bugs for this locale
Mongolian (mn)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Northern Sotho (nso)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Songhay (son)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Urdu (ur)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Azerbaijan (az)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week: Moved to Pootle. Dwayne to create new review request.
Action items (provide assignments):
Samoan (sm)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Dywane gives a heads-up that the team is demoralized by the delay
Action items (provide assignments):