Support/SUMOdev Meeting Notepad: Difference between revisions
< Support
Jump to navigation
Jump to search
(Added note about muting the microphone) |
No edit summary |
||
| Line 1: | Line 1: | ||
Tuesday (meeting duration approx. 30-45 minutes) at: | |||
* 9:00 AM PDT | * 9:00 AM PDT | ||
* 12:00 PM EDT | * 12:00 PM EDT | ||
| Line 15: | Line 15: | ||
saying anything to prevent feedback and other noise | saying anything to prevent feedback and other noise | ||
in the conference. Thank you! | in the conference. Thank you! | ||
irc.mozilla.org: #sumodev | irc.mozilla.org: #sumodev | ||
==July 21 2008== | ==July 21 2008== | ||
Revision as of 23:18, 22 July 2008
Tuesday (meeting duration approx. 30-45 minutes) at:
- 9:00 AM PDT
- 12:00 PM EDT
- 18:00 CEST
Phone call details:
- California: 650-903-0800 then extension 91
- Toronto: 416-848-3114 then extension 91
- Toll-free: 800-707-2533 then password 369
- Skype (free): +18007072533 then password 369
Then, enter the conference number: 309#
Please mute your microphone as long as you are not saying anything to prevent feedback and other noise in the conference. Thank you!
irc.mozilla.org: #sumodev
July 21 2008
- 0.6.1 triage and status
- Security bug review
- Roundtable
July 15 2008
- 0.6.1 triage [[1]]
- Scheduling:
- Subject to IT's approval (due to Summit timing and travel):
- Code freeze for 0.6.1: Thursday July 24th
- Push for 0.6.1: Tuesday July 29th
- We'll aim to be bi-weekly after this.
- Roundtable
July 8 2008
- Triage 0.6.1, 0.6.2, 0.7 and unassigned bugs.
July 1 2008
- Open bugs for 0.6: [[2]]
- Planned code freeze tonight at 11.59pm PDT: after this, no changes to production branch until we're tagged.
- Between freeze and push, QA to verify remaining closed 0.6 bugs.
- Push will occur Weds or Thurs night (dependent on IT)
- Between now and next week: review bugs with Target "--" and see what else needs to go into 0.7. (Theme for 0.7 is forum improvements.)
- Any other items?