Unified Telemetry/Status reports/July 17 2015: Difference between revisions

Simpler client summary
(Simpler client summary)
Line 8: Line 8:


=== Exec Summary ===
=== Exec Summary ===
* Not uplifting recent send logic changes to Beta (needs more bake time for confidence)
* Client work delayed this week by sick time.  
** Uplifting a few patches around the send-logic ([uplift2], http://bit.ly/1Je45UA) to Aurora as soon as the send-logic impact is verified
** Remaining client work ([uplift3], http://bit.ly/1TCl4r8) for 41 is manageable and either blocked by info requests or review
* Working toward data validation milestone on July 30: http://mzl.la/1J2OdZA
* Working toward data validation milestone on July 30: http://mzl.la/1J2OdZA
* Pipeline scaling work to be completed by July 30(?)
* Pipeline scaling work to be completed by July 30(?)
Line 44: Line 42:
=== Accomplished for Last Period ===
=== Accomplished for Last Period ===
Engineering
Engineering
* heka 0.10 beta pushed
* heka 0.10.0 beta pushed
* Client work: [https://docs.google.com/spreadsheets/d/1yAJmgCGYyk1d7A41DZa653Z3u2AbH-kDWsO1vPSgbfE/edit?usp=sharing Spreadsheet]
* Client work: [https://docs.google.com/spreadsheets/d/1yAJmgCGYyk1d7A41DZa653Z3u2AbH-kDWsO1vPSgbfE/edit?usp=sharing Spreadsheet]
** Not uplifting recent send logic changes to Beta (needs more bake time for confidence)
** Uplifting a few patches around the send-logic ([uplift2], http://bit.ly/1Je45UA) to Aurora as soon as the send-logic impact is verified
** Remaining client work ([uplift3], http://bit.ly/1TCl4r8) for 41 is manageable and either blocked by info requests or review
* Updates to the unified telemetry decoder and executive report
* Updates to the unified telemetry decoder and executive report
* [https://docs.google.com/a/mozilla.com/document/d/1KoLtIFV-aZtxruSVNmcc26F22MfqWjDynKgZ6adYk54/edit?usp=sharing Architecture flow diagram] in preparation for meeting with ops
* [https://docs.google.com/a/mozilla.com/document/d/1KoLtIFV-aZtxruSVNmcc26F22MfqWjDynKgZ6adYk54/edit?usp=sharing Architecture flow diagram] in preparation for meeting with ops
Confirmed users
539

edits