* Workweek in Mountain View with dev, product and UX members
* Workweek in Mountain View with dev, product and UX members
Product
Product
* Reviewed thoughts on product differentiators and vision for Project Link
* Discussions on product differentiators and vision for Project Link
Potential Partnership Evaluations
* Protonet (Zoe product): Initial intro meeting conducted in MV. Further product and technical review meetings scheduled for the week of March 28th.
UX
UX
* [https://drive.google.com/a/mozilla.com/file/d/0BzpS-SDqaHnAbktaaUxmdnpaLTQ/view Interaction draft specs for Recipes] reviewed
* [https://drive.google.com/a/mozilla.com/file/d/0BzpS-SDqaHnAbktaaUxmdnpaLTQ/view Interaction draft specs for Recipes] reviewed
Line 57: Line 55:
* Taxonomy integration progress for Hue and Motion Sensor Adapter
* Taxonomy integration progress for Hue and Motion Sensor Adapter
* Implementation of secure connection to FoxBox
* Implementation of secure connection to FoxBox
* Demos with Ari and Faramarz at the end of workweek
* Workweek ended with following Demos presented to Ari and Faramarz
* Implementation of simplified Recipes UI
** Implementation of simplified Recipes UI
* Web Push Adapter implementation and integration with taxonomy
** Web Push Adapter implementation and integration with taxonomy
* IFTTT (Recipes) integration demonstrated with rule created and triggered with a clock and IP camera.
** IFTTT (Recipes) integration demonstrated with rule created and triggered with a clock and IP camera.
* Taxonomy integration for IP Camera Adapter and ability to take snapshots from the app
** Taxonomy integration for IP Camera Adapter and ability to take snapshots from the app
* Kwikset Door Lock integration demonstrating discovery and open/close actions
** Kwikset Door Lock integration demonstrating discovery and open/close actions
Participation
Participation
* dev-project-link@mozilla.org public mailing list created
* dev-project-link@mozilla.org public mailing list created
* Meetings Notes from community participation plan discussion are [https://docs.google.com/document/d/1xg2dJmgwBOB1QZUxKtowCNPJ8XKW7sePHg_B_G3zn_4 here].  
* Meetings Notes from community participation plan discussion are [https://docs.google.com/document/d/1xg2dJmgwBOB1QZUxKtowCNPJ8XKW7sePHg_B_G3zn_4 here].  
* Michael Henretty is helping drive it.
|-
|-
| Smart TV for 2.6
| Smart TV for 2.6

Revision as of 15:12, 29 March 2016

Program Status Notes
Vaani Validation (Lindsay/Sandip) On Target

Demos

Engineering

  • Working through the milestones that are due on April 1st
  • Getting ready to set up work for the next sprint
  • Setting up mac env w/openHAB...
  • Getting Hue bound and working
  • Getting WEMO bound and working
  • Getting Sonos bound and working
  • Getting LIFX light bound and working
  • Creating video demo of everything working
  • Maven plugin integration to build JNI shared objects for pocketsphinx
  • Maven plugin integration to build JNI shared objects for webrtc_vad

Program

  • I am very excited to be working with this team and am ramping up
  • Looking into other ways to track the product
  • Scheduling the 2nd Demo when the execs are in Berlin

QA

  • Looked into the previous voice collection app and thought about how to convert it to a web application
  • Action: Distribute summary of the app and our approach

Participation

  • Talking with Kelly and David about coding competition and what we will need to do before we can launch.


Project Link Validation Stage (Julie/Preeti) On Target

Project

  • Workweek in Mountain View with dev, product and UX members

Product

  • Discussions on product differentiators and vision for Project Link

UX

Research

  • User research conducted for Amazon Echo product and results shared here

Engineering Workweek Accomplishments

  • Technical overview sessions presented by team members for IFTTT, Taxonomy/APIs , Adapters, Authentication/Tunneling, Web Push, Web App Modules. Presentation documentation will be shared soon on wiki.
  • Conducted Q&A session with Rust developers
  • Taxonomy integration progress for Hue and Motion Sensor Adapter
  • Implementation of secure connection to FoxBox
  • Workweek ended with following Demos presented to Ari and Faramarz
    • Implementation of simplified Recipes UI
    • Web Push Adapter implementation and integration with taxonomy
    • IFTTT (Recipes) integration demonstrated with rule created and triggered with a clock and IP camera.
    • Taxonomy integration for IP Camera Adapter and ability to take snapshots from the app
    • Kwikset Door Lock integration demonstrating discovery and open/close actions

Participation

  • dev-project-link@mozilla.org public mailing list created
  • Meetings Notes from community participation plan discussion are here.
Smart TV for 2.6 Josh On Target
Smart TV Next Gen Validation (Joe/Josh) On Target
WADI Thomas/Bill On Target
Research Lindsay On Target
Project SmartHome Maria/Liz On Target
  • Last week the team focused on:
    • The new research plan to learn about the needs of the new audiences we’ve targeted: Babysitting age (12 to 15 years old) and independent elderly (aging in place)
    • Explore limits of “making dumb things smart” in the home.
  • During this week all team members are conducting the new Research plan
  • Next week in Portland the plan is
    • Summarize Research findings
    • Choose 2 or 3 problem areas from the Research findings to focus on
    • Brainstorm solutions to these and/or our next research plan
Project Sensor Web Cindy/Wesley On Target
Porting Nicole/David/Peter On Target
FlyWeb Nicole/Dylan On Target
Firefox OS Smartphone Sunset

Smartphone Transition Wiki

Smartphone Commercial Sunset (Karen) On Target
Code Transition (Julie) Challenged
Foxfooding (Jean) On Target
Transition to Volunteer Community (George) On Target
Participation Update Brian On Target
Metrics for CD Maria On Target
  • Last Friday we finished sprint 1 The target was transmitting a sample crash ping
  • Sprint 2 will be focused on fixing validation problems on the server side when transmitting the crash ping and starting the work in the Histograms library
    • It will require a high level design first so later we can decide what components to maintain or not.
Other Announcements David B --