L10n:Weekly/2012-06-06: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 52: Line 52:
Current build channel: Aurora, see {{bug|761583}}
Current build channel: Aurora, see {{bug|761583}}


Blocks to release: Dwayne reports progress is happening, but hand-holding is required on his side
Blocks to release: Dwayne reports progress is happening, but hand-holding is required on his side.


Brief summary of interactions with the team from the past week:
Brief summary of interactions with the team from the past week: None, except dwayne's report in the bug.


Action items (provide assignments):
Action items (provide assignments): Milos to talk to Dwayne and see if he can help speeding up the process.


===Fulah (ff)===
===Fulah (ff)===

Revision as of 13:07, 6 June 2012


Meeting Details

  • Time and location: Wednesday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel

« previous meetingindexnext week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.
  • Aisle
  • Desktop

Action Items

carry-overs


New locales updates

Khmer (km)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Acholi (ach)

dashboard

Current build channel: Aurora, see bug 761583

Blocks to release: Dwayne reports progress is happening, but hand-holding is required on his side.

Brief summary of interactions with the team from the past week: None, except dwayne's report in the bug.

Action items (provide assignments): Milos to talk to Dwayne and see if he can help speeding up the process.

Fulah (ff)

dashboard

Current build channel: Beta

Blocks to release: Webdashboard bugs, positive community feedback, testing beta builds

Brief summary of interactions with the team from the past week: No interaction, moved from aurora to beta channel.

Action items (provide assignments): Milos to send an email to Ibrahima asking him to fix up the web bugs, and start promoting actively new beta builds, get feedback and report back to Milos a week or so before the release.

Malay (ms)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Burmese (my)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Maithili (mai)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

Wolof (wo)

dashboard

Current build channel: Aurora, see bug 761583.

Blocks to release: Dwayne doesn't have a active team at this point

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

  • disable aurora builds? (there's 1 ADI on fx8, not updating)

Project updates

Firefox Desktop

Current fallback status

Firefox 5
ta ta-LK
Firefox 6
bn-BD vi
Firefox 8
mk
Firefox 9
mn
Firefox 10
ar bn-IN fa ku ml pa-IN sw zu
Firefox 11
bg sr
Firefox 12
cs es-CL hu id nb-NO nn-NO nso pl tr uk
Firefox 13
be ca de el et fi ga-IE gu-IN he hi-IN kn mai or si sk te th

Firefox Mobile

Mozilla.org

AMO

MDN

SUMO

QA

Other engagement projects

Labs

Infrastructure

Tools / L20n