Last week | Next week

Name Done Plan
Hubert
  • Week W39 (09/22~09/26):
Cynthia
  • Week W39 (09/22~09/26):
Gerry
  • Week W39 (09/22~09/26):
    • Test App usage metrics
    • Finish EU-support test
    • Verify 2.1 bugs
Mike
  • Week W39 (09/22~09/26):
    • Test case mind map creation
    • Tarako power drain issue follow up
    • Madai bug verification
    • Project management training
eric
  • Week W39 (09/22~09/26):
    • Test Run for RIL
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Fixing RIL/COMMS test cases
  • Week W40 (09/29~10/03):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before CC
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
Paul
  • bug 1064800 - Re-test on master and v2.1
  • Fix test case error
  • Trigger full run on v2.1
  • Modify crash report patch based on review

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
William Hsu
  • Week W39 (09/22~09/26)
    • [Routine] Bug replication, submission, and verification.
    • [Device] Assist device related tests - Tako
      • Smoketest on Tako (ETA:9/25)
      • Gaia UI test on Tako (ETA:9/23)
      • Test strategy for CAF ES2 build (v2.0)
      • Prepare All-in-one test machine/VM for partner (Part I: Packages installation 9/26)
      • Weekly meeting with partner (9/23)
        1. Address automation test related problems
        2. Three-way synchronization with partners (progress)
    • [Device] Assist device related tests - Flame
      • Prepare jobs for Flame KK
      • Gaia UI test on v2.0 Build
  • Week W40 (09/29~10/03)
    • [Device] Assist device related tests - Tako
      • Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
      • Smoketest on Tako (ETA:10/02)
      • Gaia UI test on Tako (ETA:9/30)
      • Weekly meeting with partner (9/30)
        1. Three-way synchronization (project status)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • [OS] Help address full-run blockers
Alison Shiue
  • Week W39 (09/22~09/26)
    • Bugs verification
    • [Bluetooth] Update test cases at mozrtrap
Al
  • Week W39 (09/22~09/26)
    • Woodduck weekly triage
    • Privacy Panel Feature for v2.1
    • MCTS for v2.0/v2.1
    • Monkey Test
Walter Chen
  • Week W39 (09/22~09/26)
Shing
  • Week W39 (09/22~09/26)
    • Support metrics testing
    • Test copy-paste feature for v2.1 (Bug 1023688)
    • Automate P1 test cases for copy-paste
Edward
  • Week W39 (09/22~09/26)
    • Test/ verify sprint 5 tickets
    • Plan rearrangement resource for feature owner.
    • Smoke test for productivity apps with KK image
Askeing
  • Week W39 (09/22~09/26)
    • Develop the combo-runner framework.
    • Investigate the MCTS.
    • Fix the building/testing jobs on CI server.
    • Develop the flashing tools.
    • Prepare the information of outsourcing.