| Milestone | Date | Status | Status Notes |
|---|---|---|---|
| Kick off meeting | 3/03/2016 | Done | Kick off presentation |
| First Research plan drafted | 3/14/2016 | Done | |
| Research plan #1 drafted | 3/29/2016 | Done | |
| Portland working week to analyze the Research findings and set the following goals/milestones | 4/08/2016 | Done | |
| User Research #2 [from May 25th to 29th] | 5/08/2016 | Done | |
| London All Hands | 6/17/2016 | On target | |
| User Research #2 findings | Not Started |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold or Not Started | The project or deliverable has either not been started or has been placed on hold. |
Archived Completed Deliverables
| Milestone | Date | Status | Status Notes |
|---|---|---|---|
| First Research plan drafted | 3/14/2016 | Done | Initial Research Plan is already out of date as it was revisited. |
| Revised Research plan #1 and Interviews guides | 3/29/2016 | Done | New Research plan created to learn about the needs of the new targeted audiences: Babysitting age (12 to 15 years old) and independent elderly (aging in place). Both have caregivers who question the independence of the 2 audiences. To run this new research plan we'll be using these two Interview Guides together with these Consent & Compensation Forms. |
| Documentation about our Research findings from the Interviews | 4/27/2016 | Done | Project Haiku: User Study #1 |
| Research plan #2: Interviews guides, Research prototype, Diaries and all the documentation and logistics necessary for the User Study. | 5/24/2016 | Done | Project Haiku - User Study #2. This User Research wants to validate this hypothesis: Creating an ambient method of communicating for 12 to 15 year old girls will create fewer interruptions that distract them from being in the moment at home and at school and improve their personal connections. |
| Documentation about our Research #2 findings | Not Started |
Communication
IRC
Join the conversation on irc.mozilla.org, channel #SmartKitchen.
Getting in touch
- The best way to get in touch with us is to come and chat in our irc channel channel #haiku of irc.mozilla.org and through Discourse where we have a specific discussion forum for Project Haiku together with the rest of Connected Devices Projects.
-->
References
- Innovation Board pitch deck
- Github wiki: This page is a chronological history of our progress. We'll create more pages as we need them.
- Google Drive folder
Team
- Tamara Hills- SW Engineer
- Russ Nicoletti - SW Engineer
- Candice Serran - Product Lead/EPM
- Nicole Yee- EPM
- Kevin Grandon - SW Engineer Contributor