Mobile/Firefox for Android
< Mobile
Jump to navigation
Jump to search
Status Summary
- Photon Mobile
- Pre-Beta sign-off on Sep. 19: Yellow (ok for entering Beta, team will keep fixing the minor UI issue till release)
- Wiki Page
- Leanplum Integration
- Pre-Beta sign-off on Sep. 13: Green
- Wiki Page
Development Detail
- Release 58 has 4 Sprints (8 weeks) and we are in the 1st Sprint:
- SPRINT#58.1: W38.1 (Sep. 18) ~ W39.7 (Oct. 01)
- SPRINT#58.2: W40.1 (Oct. 02) ~ W41.7 (Oct. 15)
- SPRINT#58.3: W42.1 (Oct. 16) ~ W43.7 (Oct. 29)
- SPRINT#58.4: W44.1 (Oct. 30) ~ W45.7 (Nov. 12)
- Note we slightly adjusted the Sprint cycle in 58 to align the Release calendar, i.e., the Merge day on Monday (Nov. 13) instead of Thursday (Sep. 21) for 57.
Sprint#58.1 MVP: 3 bugs
ID | Summary | Status | Resolution | Assigned to | Depends on | Blocks |
---|---|---|---|---|---|---|
1388679 | Replace other Fennec Nightly icons | VERIFIED | FIXED | Jing-wei Wu [:jwu] | 1388291, 1389822, 1403869 |
1 Total; 0 Open (0%); 0 Resolved (0%); 1 Verified (100%);
Sprint#58.1 BACKLOG: 1 bugs
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Sprint#58.1 INTERRUPTION
9 Total; 0 Open (0%); 4 Resolved (44.44%); 5 Verified (55.56%);
Quality Assurance
Point of Contact
- Product Management: Joe Cheng
- User Experience: Anthony Lam, Jack Lin, Tori Chen, Carol Huang
- Engineering: Sebastian Kaspari, Grisha Kruglov, Max Liu, Nevin Chen, Jing-Wei Wu
- Quality Assurance: Ioana Chiorean (Test Lead)
- Program Management: Wesly Huang
Meetings
- Weekly Status Sync
- Weekly Triage: Triage Wiki
- Session#1 @Wednesday 1:00AM PST Vidyo: Mobile
- Session#2 @Wednesday 9:30AM PST Vidyo: Mobile
Reference Link
- Wiki
- Planning
- Execution