Firefox OS/DeviceQA/2014-11-03WeeklyReport

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Last week | Next week

Name Done Plan
Al
  • Week W45 (11/03~11/07)
    • Mozilla Certificate Test Suite
    • new comer training
  • Week W46 (11/10~11/14)
    • Mozilla Certificate Test Suite
      • Execute on Madai
    • Remove unnecessary test environment from moztrap
    • Africacom support (Monday and Tuesday)
Alison
  • Week W45 (11/3~11/7):
    • Bugs verification
    • Go through NFC secure element API (2.2 feature) test spec with DT developer
    • Try run marionette test for real device
  • Week W46 (11/10~11/14)
    • Bugs verification
    • Update from bzapi to new native REST API for QA-Dashboard
    • Try run marionette JS for API testing on real device
Askeing
  • Week W45 (11/3~11/7):
    • Connected Devices meeting.
    • Follow up the issues of Connected Devices.
    • Develop cross-platform tools by Python.
  • Week W46 (11/10~11/14):
    • Mozilla Certificate Test Suite
    • Connected Devices meeting.
    • Follow up the Card UI tasks and issues.
    • Develop cross-platform tools by Python.
Cynthia
  • Week W45 (11/3~11/7):
    • Marionette JS automation script for Email-Signature
      • In setting, default signature is "Sent Using Firefox OS"
      • In account setting, edit signature
      • Set signature in new account page
      • Original signature cannot be changed when user modified signature in mail body
    • Africacom support: Assist Al in testing on Open C
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Test/verify bugs for Woodduck
  • Week W46 (11/10~11/14)
    • Create test cases for email forwarding attachments (v2.2)
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Test/verify bugs for Woodduck
Edward
  • Week W45 (11/3~11/7):
    • Verify sprint 7 and 8 tickets of productivity
    • Create test cases (user flow) for power consumption.
    • QAwanted bug verification and figure out issue.
  • Week W46 (11/10~11/14)
    • Verify sprint 8 tickets of productivity
    • Complete test case creation of power consumption
    • Tune up CI server for Marionette JS envtionment
Eric
  • Week W45 (11/3~11/7):
    • API testing checking
    • Market customization testing
    • Bugs testing with local patch
  • Week W46 (11/10~11/14):
    • API testing checking
    • Moztrap cleanup plan
Gerry
  • Week W45 (11/3~11/7):
    • Finish test cases categorization for "System Platform"
    • Follow up and verify bugs reported by QAnalyst.
  • Week W46 (11/10~11/14):
    • Follow up and verify bugs reported by QAnalyst.
    • Moztrap cleanup
Hubert
  • Week W45 (11/03~11/07):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
  • Week W46 (11/10~11/14):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
Mike
  • Week W45 (11/3~11/7):
    • Flame:
      • FOTA verificaton
      • Rescue tool verification
    • Discuss power consumption benchmark
    • Fix orangutan issue
    • Django study group
  • Week W46 (11/10~11/14):
    • Flame FOTA verificaton
    • Power consumption framework
Paul
  • MTBF report analysis
  • Django study group
  • Modify lab script by python
  • Merge debug setting tools
  • Modifying crash report patch based on review

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Chaos Monkey for b2g (random process killer)
  • Memory stress test
Shing
  • Week W44 (11/3~11/7):
    • MozTrap enhancement plan
    • Studied Django
    • MozTrap Performance Investigation
    • Studied App with persistence
    • Verify Marigold bugs
  • Week W45 (11/10~11/14):
    • Verify Bugs
    • Finish cost control automation
    • MozTrap Enhancements: plan addon features
    • Django study group
    • Backlog:
      • Practice App with persistence.
Teri
  • Week W45 (11/03~11/07)
    • Verify Marigold test reports.
    • Learn to write/run FxOS app.
    • Learn about productivity apps.
  • Week W46 (11/10~11/14)
    • Study productivity bugs.
    • Practice writing Gaia UI test.
    • Learn about node.js.
    • Practice write/run FxOS app.
Walter
  • Week W45 (11/3~11/7):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
    • Restruct
  • Week W46 (11/10~11/14):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
    • Restruct
    • Discussion of lab issues
William Hsu
  • Week W45 (11/03~11/07)
    • [Device] Assist Tako related stuffs
      1. Assign Tako's bugs to developers and stakeholders.
      2. Weekly meeting with partner (11/04, TBC)
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      • Address camera failed tests
        1. test_sms_with_attachments.py
        2. test_camera_flash_modes.py
    • Others,
      • Health examination: Nov. 3rd (Morning).
      • Personal leave: 11/06~11/07.
  • Week W46 (11/10~11/14)
    • [Device] Assist Tako related stuffs
      • Assign Tako unsolved bugs to developers and stakeholders.
      • Tako v2.1 sync-up meeting with partners (11/11)
      • Discussing test plan with Tony
    • [Device] Assist Flame related stuffs
    • Others,
      • Meetings with Tony
      • Personal leave: 11/10.