Firefox OS/DeviceQA/2014-11-10WeeklyReport

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Last week | Next week

Name Done Plan
Al
  • Week W46 (11/10~11/14)
    • Mozilla Certificate Test Suite
      • Execute on Madai
    • Remove unnecessary test environment from moztrap
    • Africacom support (Monday and Tuesday)
  • Week W47 (11/17~11/21)
    • Three days off and QA Team building for one day
    • MCTS for Stringray project discuss
Alison
  • Week W46 (11/10~11/14)
    • Bugs verification
    • Update from bzapi to new native REST API for QA-Dashboard
    • Try run marionette JS for API testing on real device
  • Week W47 (11/17~11/21)
    • Practice Marionette JS for API testing
    • Prepare simple SE API test case for DT
Askeing
  • Week W46 (11/10~11/14):
    • Mozilla Certificate Test Suite
    • Connected Devices meeting.
    • Follow up the Card UI tasks and issues.
    • Develop cross-platform tools by Python.
  • Week W47 (11/17~11/21):
    • Follow up Woodduck build issue.
    • Mozilla Certificate Test Suite
    • Connected Devices meeting.
    • Plan Gaia Build process with Gaia team.
    • Android L Porting.
Cynthia
  • Week W46 (11/10~11/14)
    • Create test cases for email forwarding attachments (v2.2)
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Test/verify bugs for Woodduck
  • Week W47 (11/17~11/21)
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Test/verify bugs for Woodduck
    • Power consumption planning / discussion
      • Optimize Radio Use while in Sleep Mode (Bug 1098316)
      • Disable GPS When not in use or in foreground (Bug 1093618)
      • Enable WiFi Low Power Mode by default (Bug 1084156)
Edward
  • Week W46 (11/10~11/14)
    • Verify sprint 8 tickets of productivity
    • Complete test case creation of power consumption
    • Tune up CI server for Marionette JS envtionment
  • Week W47 (11/17~11/21)
    • Power consumption planning / discussion
    • Prepare automation scrum for TPE
    • Verify sprint 8/ 9 tickets of productivity
Eric
  • Week W46 (11/10~11/14):
    • Code coverage testing checking
      • JSCover, Istanbul
    • Moztrap cleanup plan
  • Week W47 (11/17~11/21):
    • Code coverage testing checking with RD
      • blanket.js
    • Moztrap plan for WW
    • V2.2 Prep
Gerry
  • Week W46 (11/10~11/14):
    • Follow up and verify bugs reported by QAnalyst.
    • Moztrap cleanup
  • Week W47 (11/17~11/21):
    • Follow up and verify bugs reported by QAnalyst
    • Start to look at fxosqa-auto-backlog
    • V2.2 Prep
Hubert
  • Week W46 (11/10~11/14):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
  • Week W47 (11/17~11/21):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
Mike
  • Week W46 (11/10~11/14):
    • Flame task:
      • FOTA verificaton
      • L porting discussion
      • Bug work
    • Power consumption task:
      • Direction discussion
      • Test method discussion
      • Test case creation
      • Compare automation tool with Orangutan
  • Week W47 (11/17~11/21)
    • Power consumption task:
      • Test method discussion
      • Test case creation
      • Compare automation tool with Orangutan
      • Power tool sharing
    • Branch management discussion
Paul
  • Merge debug setting tools
  • bug work
  • mtbf_operation script refactor
  • Prepare Portland ww sessions

-- backlog --

  • Modifying crash report patch based on review (pending to b2gDevice in mozbase)
  • Followup live test run stream
  • Datazilla integration
  • Chaos Monkey for b2g (random process killer)
  • Memory stress test
Shing
  • Week W46 (11/10~11/14):
    • Finished cost control automation
    • MozTrap Enhancements: plan addon features
    • [MozTrap] Added bulk suite edit
    • Practiced App with persistence.
    • Setup Skype chat bot
  • Week W47 (11/17~11/21)
    • [MozTrap] Improve frontend JS performance
    • Contribute to automation test
    • Prepare persistence sharing
    • Study ScreenSharingAPI and SyncAPI
    • --backlog--
      • [MozTrap] Uplift JS performance fix to master branch
Teri
  • Week W46 (11/10~11/14)
    • Study productivity bugs.
    • Practice writing Gaia UI test.
    • Practice write/run FxOS app.
    • Setup Marionette JS environment.
  • Week W47 (11/17~11/21)
    • Prepare for V2.2 productivity
    • Practice Marionette JS test cases
    • Practice write/run FxOS app.
    • Learn about node.js.
Walter
  • Week W46 (11/10~11/14):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
    • Restruct
    • Discussion of lab issues
  • Week W47 (11/17~11/21):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • Help T2M with issues
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
        • Help T2M with setting up environment
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
        • lmk.js experiments (some more issues)
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
        • Reproduced in v180 v184 v188 and log provided.
    • Restruct
      • Combo Runner restruct done
      • MTBF restruct in process
William Hsu
  • Week W46 (11/10~11/14)
    • [Device] Assist Tako related stuffs
      • Assign Tako unsolved bugs to developers and stakeholders.
      • Tako v2.1 sync-up meeting with partners (11/11)
      • Discussing Tako's test plan with Tony
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Discuss v2.1 branch management and file related documentations
      • v2.0 Bug verification (verifyme)
    • Others,
      • Meetings with Tony
      • Personal leave: 11/10.
  • Week W47 (11/17~11/21)
    • [Device] Assist Tako related stuffs
      • Assign Tako unsolved bugs to developers and stakeholders.
      • Coach Marigold for flashing Tako device.
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Create jobs (Jenkins) for v2.1 Branch - Automation tests
      • Gaia UI test on v2.1 Build
      • v2.0 Bug verification (verifyme)
    • Others,
      • Team building
Hermes cheng
  • Week W46 (11/10~11/14)
    • familiar with env and set up working Env including Desktop & notebook
      • try to build by myself (failed now)
      • set up automated test env and try some gaia UI/integration tests (marionette)
    • meeting with Tony
      • start to study assigned V2.2 features
  • Week W47 (11/17~11/21)
    • keep studying automated testing and try some existing test cases from MozTrap? (marionette)
    • keep studying assigned V2.2 features
      • clarify my questions on Bugzilla