Firefox OS/DeviceQA/2014-11-17WeeklyReport

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Last week | Next week

Name Done Plan
Al
  • Week W47 (11/17~11/21)
    • Three days off and QA Team building for one day
    • MCTS for Stringray project discuss
  • Week W48 (11/24~11/28)
    • MCTS for Stringray project implementation
      • Planning and implementation
      • Certificate Permission App
Alison
  • Week W47 (11/17~11/21)
    • Practice Marionette JS for API testing
    • Prepare simple SE API test case for DT
  • Week W48 (11/24~11/28)
    • Verify bugs
    • Trouble shooting for SE API testing issue by marionette JS (DT execute)
Askeing
  • Week W47 (11/17~11/21):
    • Follow up Woodduck build issue.
    • Mozilla Certificate Test Suite
    • Connected Devices meeting.
    • Plan Gaia Build process with Gaia team.
    • Android L Porting.
  • Week W48 (11/24~11/28):
    • Device Builds discussion.
    • Plan Gaia Build process with Gaia team.
    • Android L Porting.
    • Follow up Woodduck build issue.
    • Mozilla Certificate Test Suite discussion.
    • Connected Devices meeting.
Cynthia
  • Week W47 (11/17~11/21)
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Test/verify bugs for Woodduck
    • Power consumption planning / discussion
      • Optimize Radio Use while in Sleep Mode (Bug 1098316)
      • Disable GPS When not in use or in foreground (Bug 1093618)
      • Enable WiFi Low Power Mode by default (Bug 1084156)
  • Week W48 (11/24~11/28)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Test/verify bugs for Woodduck
    • Generate test cases for Power consumption
      • Optimize Radio Use while in Sleep Mode
      • Disable GPS When not in use or in foreground
      • Enable WiFi Low Power Mode by default
Edward
  • Week W47 (11/17~11/21)
    • Power consumption planning / discussion
    • Prepare automation scrum for TPE
    • Verify sprint 8/ 9 tickets of productivity
  • Week W48 (11/24~11/28)
    • Power consumption planning / testing sheet creation / create test case
    • [2.2][SysP] Study 2.2 feature spec
    • [2.2][Prod] Study 2.2 feature spec
Eric
  • Week W47 (11/17~11/21):
    • Code coverage testing checking with RD
      • blanket.js
    • V2.2 Prep
Gerry
  • Week W47 (11/17~11/21):
    • Follow up and verify bugs reported by QAnalyst
    • Start to look at fxosqa-auto-backlog
    • V2.2 Prep
  • Week W48 (11/24~11/28)
    • Follow up and verify bugs reported by QAnalyst
    • [2.2] Study 2.2 feature spec - keyboard
    • [2.2] Study 2.2 feature spec - wifi
Hubert
  • Week W47 (11/17~11/21):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
  • Week W48 (11/24~11/28):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Audit issue quality filed by Marigold
    • Create OTA test document for Marigold.
Mike
  • Week W47 (11/17~11/21)
    • Power consumption task:
      • Test method discussion
      • Test case creation
      • Compare automation tool with Orangutan
      • Power tool sharing
    • Branch management discussion
    • EWC Handover
  • Week W48 (11/24~11/28)
    • Power consumption: Version comparison
    • Follow up v2.1 bugs
Paul
  • mtbf_operation script refactor
  • Investigation for process killer poc
  • Prepare Portland ww sessions

-- backlog --

  • Modifying crash report patch based on review (pending to b2gDevice in mozbase)
  • Followup live test run stream
  • Datazilla integration
  • Chaos Monkey for b2g (random process killer)
  • Memory stress test
Shing
  • Week W47 (11/17~11/21)
    • [MozTrap] Improve frontend JS performance
    • Study ScreenSharingAPI and SyncAPI
    • --backlog--
      • [MozTrap] Uplift JS performance fix to master branch
  • Week W48 (11/24~11/28)
    • [MozTrap] Submit JS modifications to upstream
    • [2.2] Study 2.2 feature spec
    • [2.2] Study 2.2 new API (ScreenSharing and Sync)
    • [MozTrap] Study MozTrap RESTful API
Teri
  • Week W47 (11/17~11/21)
    • Prepare for V2.2 productivity
    • Practice Marionette JS test cases
    • Practice write/run FxOS app.
    • Learn about node.js.
  • Week W48 (11/24~11/28)
    • [2.2] Study Productivity: calendar and email feature spec
      • Test run apps to get familiar
      • Study MozTrap test cases
      • Study RTL specs (including clock)
    • Learn about pairwise testing
Walter
  • Week W47 (11/17~11/21):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • Help T2M with issues
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
        • Help T2M with setting up environment
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
        • lmk.js experiments (some more issues)
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
        • Reproduced in v180 v184 v188 and log provided.
    • Restruct
      • Combo Runner restruct done
      • MTBF restruct in process
  • Week W48 (11/24~11/28)
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • Help T2M with issues
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
        • lmk.js experiments (some more issues) and need more patches
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
        • Reproduced in v180 v184 v188 and log provided.
      • Bug 1076605 - [MTBF][App Launch] Apps failed to launch, stuck at icon splash
        • Customized patches and fixes, now patched.
    • Restruct
      • MTBF restruct in process
    • Portland workweek
William Hsu
  • Week W47 (11/17~11/21)
    • [Device] Assist Tako related stuffs
      • Assign Tako unsolved bugs to developers and stakeholders.
      • Coach Marigold for flashing Tako device.
      • Weekly meeting with partners
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Create jobs (Jenkins) for v2.1 Branch - Automation tests
      • Gaia UI test on v2.1 Build
      • v2.0 Bug verification (verifyme)
    • Others,
      • Team building
  • Week W48 (11/24~11/28)
    • [Device] Assist Dolphin related stuffs
      • Performance evaluation (Smoketest, test-perf, and Gaia UI test)
      • FPS measurement
    • [Device] Assist Tako related stuffs
      • Follow remaining tasks, and close Tako's bug (v2.1 & v2.0)
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Gaia UI test on v2.1 Build
      • Tune GU's testvars (Flame v2.1)
      • v2.0 Bug verification (verifyme)
Hermes cheng
  • Week W47 (11/17~11/21)
    • Study automated testing
    • [2.2] keep studying assigned V2.2 features
      • Study 1098385 specs (OS update), clarify questions with PM, UX team on bugzilla
  • Week W48 (11/24~11/28)
    • [2.2] keep studying assigned V2.2 features
      • Start to design test cases for 1098385 (OS update)
      • Study 1098393 (Task Manager) and clarify questions
      • No spec for 1098376 (flashlight) now, holding
    • [MozTrap] find out unfriendly interaction