L10n:Planning/2012-08-20

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


« previous meetingindexnext week » create?

News and Talking Points

  • status of the preparation for the Warsaw work week
  • status of the preparation for the MozCamp

Administrative

   Time and location: Monday, 8 AM PST, conf bridge 206 
   irc.mozilla.org #l10n-drivers for back-channel 
   Call-in details: https://wiki.mozilla.org/L10n:Planning#Meeting_Details
   Previous meeting notes: https://wiki.mozilla.org/L10n:Planning
   Attendees: Pike, arky, Jeff, chofmann, mathjazz


Action Items

put holiday dates here:

pascal aug 20-sept 4 milos? - probably sept 11-20, but still need to confirm. matjaz: sept 14-17 jeff - back to full time on last week in aug stas in brazil end of aug axel time off next week chofmann tues and next monday gandalf aug 23/24 poland: Aug 15 - public holiday


Roundtable

add [done] to items completed last week; remove previous [done] items

arky

chofmann

gandalf

  • [done] updates to pyast templating language
  • [done] support for context merging in l20n.js
  • still bugs in pyast
  • working with EU Border Guard on MozCamp coming from outside of Shengen

Jeff

  • [done] Finish draft of l10n slides for ReMo.
  • [done] Follow up on conversation about Get Involved inquiries with pt-BR, ES, Boswell, and Rosana.
  • [done] Push discussion about L10n sessions in Grow Mozilla sprint.
  • [done] Create L10n:Communication page.
  • [done] Update L10n:Stock_Responses to reference L10n:Contribute


  • Review all l10n pages in MDN and correct their page/paragraph/character formats.
  • Finish edit of L10n on Mercurial tutorial.
  • [researching/planning] Draft "Interpreting dashboards" doc on MDN.
  • Begin session prep for mozcamp.
  • Follow up on wiki page updates.
  • Discuss "catch-up" dates with ta, bn-BD, and follow up with Arky about vi.

Matjaž

  • [done] Persona: get strings ready for the new train and communicate with localizers
  • [done] Pontoon: Admin interface
  • Pontoon: document how to make a website localizable with Pontoon
  • Pontoon: bug squashing
  • Elmo: get environment up and running
  • Elmo: bug 748781


Milos

[done] Productization for all locales update - no pending questions in bugzilla [done] * Final testing of Affiliates FB app this week

    • string merge for Affiliates FB app
    • [done] Finish up news item translation
  • LSV update
  • Bedrock hacking

Pascal

  • [done] Transvision 1.2, second update to the tool
  • [done] Reviewed localization of OneMozilla blog theme source code
  • [done] Newsletter center and forms on mozilla.org in Russian and Indonesian working, waiting for activation of database settings on production
  • [done] Create a contribute branch on github (because webdev team still hasn't done it) and port all the changesets needed to get that branch working
  • [done] started working with new French localizer Sam (from Friedmann) and Guillemette, a new volunteer
  • Work on Transvision 1.3 (I try to have weekly minor releases over the summer and potentially fix regressions the week after instead of big releases)
  • Get apps/partners page on production for Spanish and Portuguese by the end of the week with a workaround for the unisubs problems our webdev can't fix
  • Get the database API settings changes needed for new newsletters fixed so as that I can push Russian and Indonesian live
  • Wednesday is bank holiday in France, I will probably take Thursday and Friday off as I have a lot of PTO to use


Pike

  • Fennec 16
    • Erin to get string freeze for 16 next
    • expose progress towards that in public
  • beta uplift for Acholi
  • [done] wrap up some elmo patches (releng shipping flow)
  • l10n qa for fennec, follow up actions: https://etherpad.mozilla.org/qa-l10n-meeting
  • Aisle
    • still not sure how c9 works wrt extensions
  • [done] Fennec shipping discussion with Asa, mfinkle, blassey, Karen, chofmann
    • evaluate shipping all-android-locales build with just native and browser strings
      • [done] prototype build up, just 1M larger than plain en-US build
      • loads of technical details TBD
    • needs feedback and confirmation still
    • if this works, we'll need to talk about those locales not on android

stas

  • [done] updated the meeting archives for the past 3 weeks
  • [done] wrote 240+ testcases for the l20n compiler (95% testing coverage)
  • [done] fixed many bugs in compiler which I discovered with the testcases
  • [done] proof-of-concept build of Gaia with L20n enabled: https://github.com/stasm/gaia/tree/l20n (how to run: git clone https://github.com/stasm/gaia, git checkout -b l20n origin/l20n, DEBUG=1 make profile, [firefox|b2g] -profile profile/)
  • finish the documentation for the compiler
  • work on the httpd.js module for Gaia l10n testing, which looks for l10n files in different locations than the default
  • l20n: work on language negotiation