L10n:Weekly/2012-06-06

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Meeting Details

  • Time and location: Wednesday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel

« previous meetingindexnext week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.
  • Locales updates
  • Aisle
  • Desktop

Action Items

carry-overs


New locales updates

Khmer (km)

dashboard

Current build channel: release

Blocks to release: none, nada, nikt, keiner, nič, ништа, नहीं

Brief summary of interactions with the team from the past week: Decided we're gonna go and ship them.

Action items (provide assignments):

Acholi (ach)

dashboard

Current build channel: Aurora, see bug 761583

Blocks to release: Dwayne reports progress is happening, but hand-holding is required on his side.

Brief summary of interactions with the team from the past week: None, except dwayne's report in the bug.

Action items (provide assignments): Milos to talk to Dwayne and see if he can help speeding up the process.

Fulah (ff)

dashboard

Current build channel: Beta

Blocks to release: Webdashboard bugs, positive community feedback, testing beta builds

Brief summary of interactions with the team from the past week: No interaction, moved from aurora to beta channel.

Action items (provide assignments): Milos to send an email to Ibrahima asking him to fix up the web bugs, and start promoting actively new beta builds, get feedback and report back to Milos a week or so before the release.

Malay (ms)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week:

  • Arky: Helping Syafiq with understand hg and help him make first sign off

Action items (provide assignments):

Burmese (my)

dashboard

Current build channel:

Blocks to release:

Brief summary of interactions with the team from the past week: Arky:

  • Roped in few more l10n contributors
  • Chit filled bug about non-unicode fonts in existing translations
  • Confirmed and L10n team fixing the strings

Action items (provide assignments):

Maithili (mai)

dashboard

Current build channel: Beta

Blocks to release: 2 p12n bugs, aurora is red

Brief summary of interactions with the team from the past week: Sangeeta responded to Milos' email and said he'll start working on bugs soon.

Action items (provide assignments): Wait for progress.

Wolof (wo)

dashboard

Current build channel: Aurora, see bug 761583.

Blocks to release: Dwayne doesn't have a active team at this point

Brief summary of interactions with the team from the past week:

Action items (provide assignments):

  • disable aurora builds? (there's 1 ADI on fx8, not updating)

Project updates

Firefox Desktop

Current fallback status

Firefox 5
ta ta-LK
Firefox 6
bn-BD vi
Firefox 8
mk
Firefox 9
mn
Firefox 10
ar bn-IN fa ku ml pa-IN sw zu
Firefox 11
bg sr
Firefox 12
cs es-CL hu id nb-NO nn-NO nso pl tr uk
Firefox 13
be ca de el et fi ga-IE gu-IN he hi-IN kn mai or si sk te th

Firefox Mobile

Mozilla.org

AMO

MDN

SUMO

QA

Other engagement projects

Labs

Infrastructure

Tools / L20n