Support/SUMOdev Meeting Notepad/2010 Q3

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

28 September, 2010

Releases

  • Mobile today!
    • Essentially, this is good-bye mobile.support. Redirecting all traffic to SUMO.
  • Customer Care Thursday.

Customer Care Status

?

Roundtable

  • Ricky
  • Erik
  • Paul
  • James
  • QA

21 September, 2010

Roundtable

  • James
  • Ricky
  • Paul
  • Erik
  • QA

14 September, 2010

Code Re-Review Day

  • Today (maybe part of tomorrow) let's review the work we've done so far on 2.3.
  • Really review the code, be harsh. Look for little things and bigger, architectural things equally. If we've done something badly let's fix it sooner than later.
  • Try to use it a little, as well. The UI is largely missing so this is tough but give it a shot.
  • Let's divide up sections to review, preferably parts you neither wrote nor reviewed the first time.
  • File bugs! Focus on the reviewing for at least the first half+ of today, file bugs as you go, and this afternoon or tomorrow we'll start fixing them.

Roundtable

  • Paul
  • Ricky
  • Erik
  • James

31 August, 2010

Releases

  • Post-2.2.3
    • Really smooth! What did we do right?
    • What, if anything, went badly?
  • Pre-2.2.4

Priorities

  • We lost focus last week—we're now about a week behind.
    • We didn't start the media gallery.
    • We put a lot of effort into fixing things that should have waited.
  • Priorities right now.
    1. Fix solution notifications.
    2. Get 2.3 back on track.
    3. Anything targeted to 2.2.5 can wait.

Roundtable

  • Ricky
  • Paul
  • Erik
  • James
  • QA

Misc

24 August, 2010

Releases

  • Post-2.2.2
    • What can we do to prevent these data-loss bugs in the future?
    • What went well?
  • 2.2.4
    • Schedule. Code complete this week?
  • 2.2.5
    • Little input from us.
    • Simple questions? Advanced go to Wenzel or Alex.

Roundtable

  • Erik
  • Ricky
  • Paul
  • James
  • QA

Misc

  • Inter-team communication.
    • Asking great questions.
    • Announcing features landing.

17 August, 2010

  • 2.2.2 - Pushing Thursday
    • Getting some AAQ changes in in preparation for mobile merge
    • SUMO team actions (per migration plan, Cheng's email)
    • Mobile push to disable registration
  • 1 week prior to 2.2.3 (no dev actions, no push)
    • lock mosumo forum entirely (per migration plan, Cheng's email)
  • 2.2.3 - Mobile merge
    • Targeted for end of month (26+ aug)

Roundtable

  • Erik
  • Ricky
  • Paul
  • James
  • QA

Misc?

10 August, 2010

  • 2.2.1 is wrapped, going out today. 17 bugs in < 1 week, nice work!
  • 2.2.2 - Will figure out the schedule later this morning, with the mobile merge (2.2.3?) and 2.3.

Post-release

2.2 - What went well? What went badly?

  • Migration process was slow.
  • User migration semi-failed with no way to continue or roll back.
  • Issues with library versions on web heads.
  • Otoh, a stable release that stuck on the first attempt!

2.2.1 Push

Any other steps?

Misc?

3 August, 2010

  • Great work on 2.2! Let's see it all the way home tomorrow.
  • 2.2.1 is a much lighter milestone.
    • These are the only bugs we're taking.
    • Turn around target: 1-2 weeks, tops, though the on-site might interfere.
  • If you have things to add to the on-site, go for it. I'm putting together a rough schedule.

Pre-release

Roundtable

  • Paul
  • Josh
  • Erik
  • Ricky
  • James
  • QA

Misc?

27 July, 2010

  • Star Craft II! (Those of you who already have it, I hate you a little.)
  • 2.2 m
    • 17 open bugs (9 P1). 4 unassigned.
    • Focus on P1s, then P2s. Anything lower can slip if it has to. (ie: do those last!)
    • Fx4.0b3, releasing in ~2 weeks, is our deadline. Need to freeze by Wednesday!

Roundtable

What is blocking you, or what do you absolutely not have time to do for 2.2?
  • Paul
  • Josh
  • Erik
  • Ricky
  • James
  • QA

Misc?

20 July, 2010

  • 2.2 m
    • 3322(+2 tracker) open bugs. 118 unassigned. (+2 in 1.5.6)
    • Can we sprint and hit the 26th?
    • Please focus on P1s, then P2s, etc.
  • Active administrator accounts on production
    • QA: do you all need them, or can we trim it down to one?


Roundtable

  • Paul
  • Josh
  • Erik
  • Ricky
  • James
  • QA

Misc?

13 July, 2010

  • 2.2
    • Freeze by 26 July (aim for 23rd).
    • Still a lot to do:
      • Moderators.
      • Anonymous questions.
      • Screenshots.
      • Tag filters.
      • Searching.
      • And more!
  • SUMOdev On-site
    • August 9th-13th
      • Travel dates?
    • Goals
      • KB kick off
      • Mobile strategy
      • Others?

Roundtable

  • Paul
  • Josh
  • Erik
  • Ricky
  • James
  • QA

Misc?