QA/Fennec/Milestones/6.0/RC 1
« Fennec:fx6b5 | Fennec:fx6b6 | » Fennec:fx6rc1
Fennec 6.0 Beta Test Plan
- Current Milestone: Firefox mobile 6
- Release: Tuesday Aug 16th
- QA Contact: Kevin Brosnan
- IRC: irc://irc.mozilla.org#qa kbrosnan
- Builds: Firefox 6.0
Smoketests
Assigned | Device | Status |
Andreea | Android | Completed - August 12th |
Andreea | Maemo - N900 | Completed - August 12th |
Andreea | Tablet | Completed - August 12th |
Lite verification tests (or smoketests) will be first run when the builds are ready. Tests are available on litmus under the Fennec 6.0 Test Suite. In any case of failure in any Smoketest, blockers need to be raised ASAP before proceeding to the BFTs.
BFTs for 6.0 Features
Assigned | Device | Status |
Anna, Cristian, Catalin | Android: Devices: Motorola Droid 2 (Android 2.2), HTC Desire Z (Android 2.3), HTC Desire (Android 2.2) | Completed, August 12th |
BFTs are a more comprehensive set of litmus tests that cover functional testing of features that have landed on Fennec 6. Tests are available on litmus under the Fennec 6 Test Suite.
Virtual Machines
Verify tests against the following devices - smoketest and BFTs
Assigned | Device | Status |
Andreea | HTC Evo 4G | Completed - August 12th |
Andreea | Xperia Play | Completed - August 12th |
Bug Fixes
Work includes wrapping up bug verifications from the Aurora channel. There are no specific beta bug fixes in this first release.
Issues Found/Reopened Bugs
- bug 676780 - Fennec is unable to load webpages and close tabs
Exploratory Testing
Spend time testing the release canidate builds on as many devices as possible. Work through the top site tests.
Web Content Review
Review web content prepared for the release. Make sure that the bugs fixed in the release are noted and that version numbers through the document are correct. Read through the document and look for other inconsistencies.
Signoff on update/install
After Firefox is released to the Android market verify that updating and installing Firefox mobile works on several devices. Send an email to release drivers on completion of this work.