Services/Meetings/2011-06-21
From MozillaWiki
- Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
- Place: Mozilla HQ, North Bridge
- Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
- Phone (Toronto): 416 848 3114 x92 Conf: 8616#
- Phone (US): 800 707 2533 (pin 369) Conf: 8616#
Who's away?: .
Ops
Loadtest
- more excellent findings.
Engineering
Account Registration/Management
Python Registration Server (reg/sreg) (Tarek)
(Toby) New user, user management and reset code modules have been checked into server-core. Everything is backwards compatible, so new products can start to use the new modules. Will start retrofitting reg/sreg tomorrow
LDAP retrofitting is now underway. First stage is complete and new accounts are now writing to the new dn and addng a syncNode record. Next step is to copy all primaryNode:weave values into syncNode and move all accounts to the new dn structure.
Account Portal (Toby)
Account portal retrofit is mostly complete. Posted preliminary version for review, but a few things have changed since, so should have a v2 up tonight or tomorrow.
Node Assignment (Toby)
Sync
Python Sync Server (Tarek)
- Load testing started
PHP Sync Server (Toby)
Sync Client (philikon/rnewman)
- about:sync-log changed, see philikon's blog post
- Instant Sync nearing completion this week
- rnewman + philikon paired on async APIs
- discussing EOL of add-on
Identity
Server (JR)
Done:
- Wrote out Engineering plan for server, web client and firefox clients
- rolled server out to id1 as internal test platform.
Doing:
- Work with rmiller on client interface
- Finalize Identity engineering plan dates and milestones
Web Client (rmiller)
Done
- Lots of progress on the core client implementation
- Ripped out the homegrown inter-iframe communication framework to use jschannel
Doing
- UI for id selection at getVerifiedEmail time
- integration w/ server component
Client (ddahl)
System Management
Big Lebowski (rtilder)
Notifications
Engineering (Paul/JR)
Done:
- Jetpack client
Doing:
- Work on notifications engineering plan (jr)
- Write scripts to load test server (paul)
Beta Channel
mconnor:
- Initial meetings with Legal/PMM last week. Followups planned for this week.
- Infra work cranking away. Go Ops!
QA
Testing and Sign-offs (tracy)
- Welcome James Bonacci! Services QA Lead
- weekly trains running smoothly
- Server push signed off by tony (tracy had an emergency in the family)
- Client on s-c for this week has two fixes: QA will sign off today.
- Identity to be taken by James.
- Services QA will be having a work week July 18th to 22nd.
Grinder Scripts (ocoutts)
- Have created an object that tries to emulate the functions of a Firefox client.
- Working on making sure that my API functions more accurately match the behavior of a Firefox client
- Scripts are becoming fatter - may effect the amount of tests we can run at once.
TPS (jgriffin)
Deployment Requests
- Python Sync!!!!1111one
Metrics
Reports and Monitoring (daniel)
Product
Sync
Firefox 6
- Sync In-browser Discoverability - blocked by a few bugs, 1 review and 2 graphics, bug 659578, bug 659267, and bug 659266.
Firefox 7
- Instant Sync - tracking to be in for Aurora merge on 2011-07-05. Can Jen add to release tracking page for FF7?
Beyond
- Add-on EOL Plan being finalized.
- Improve Sync Set Up Process -
- had an internal usability study on Monday to look at mobile sync set up.
- Next steps, read out from User Research. Iterate on the proposed changes and lock down UX mock ups and requirements.
- Update the Sync Road Map page with a better sequence section of engineering tasks and add a Sync Feature Inbox list
- Working with PMM on updating pages with Sync references
- Working with Services Support on Sync support content
Security
Marketing
Roundtable
Q3 Goals
Draft: http://lunch.mozilla.org:9000/services-q3-goals