Services/Meetings/2011-06-21

From MozillaWiki
Jump to: navigation, search
  • Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
  • Place: Mozilla HQ, North Bridge
  • Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
  • Phone (Toronto): 416 848 3114 x92 Conf: 8616#
  • Phone (US): 800 707 2533 (pin 369) Conf: 8616#

Who's away?: .

Ops

Loadtest

  • more excellent findings.

Engineering

Account Registration/Management

Python Registration Server (reg/sreg) (Tarek)

(Toby) New user, user management and reset code modules have been checked into server-core. Everything is backwards compatible, so new products can start to use the new modules. Will start retrofitting reg/sreg tomorrow

LDAP retrofitting is now underway. First stage is complete and new accounts are now writing to the new dn and addng a syncNode record. Next step is to copy all primaryNode:weave values into syncNode and move all accounts to the new dn structure.

Account Portal (Toby)

Account portal retrofit is mostly complete. Posted preliminary version for review, but a few things have changed since, so should have a v2 up tonight or tomorrow.

Node Assignment (Toby)

Sync

Python Sync Server (Tarek)

  • Load testing started

PHP Sync Server (Toby)

Sync Client (philikon/rnewman)

  • about:sync-log changed, see philikon's blog post
  • Instant Sync nearing completion this week
  • rnewman + philikon paired on async APIs
  • discussing EOL of add-on

Identity

Server (JR)

Done:

  • Wrote out Engineering plan for server, web client and firefox clients
  • rolled server out to id1 as internal test platform.

Doing:

  • Work with rmiller on client interface
  • Finalize Identity engineering plan dates and milestones

Web Client (rmiller)

Done

  • Lots of progress on the core client implementation
  • Ripped out the homegrown inter-iframe communication framework to use jschannel

Doing

  • UI for id selection at getVerifiedEmail time
  • integration w/ server component

Client (ddahl)

System Management

Big Lebowski (rtilder)

Notifications

Engineering (Paul/JR)

Done:

  • Jetpack client

Doing:

  • Work on notifications engineering plan (jr)
  • Write scripts to load test server (paul)

Beta Channel

mconnor:

  • Initial meetings with Legal/PMM last week. Followups planned for this week.
  • Infra work cranking away. Go Ops!

QA

Testing and Sign-offs (tracy)

  • Welcome James Bonacci! Services QA Lead
  • weekly trains running smoothly
    • Server push signed off by tony (tracy had an emergency in the family)
    • Client on s-c for this week has two fixes: QA will sign off today.
  • Identity to be taken by James.
  • Services QA will be having a work week July 18th to 22nd.

Grinder Scripts (ocoutts)

  • Have created an object that tries to emulate the functions of a Firefox client.
  • Working on making sure that my API functions more accurately match the behavior of a Firefox client
  • Scripts are becoming fatter - may effect the amount of tests we can run at once.

TPS (jgriffin)

Deployment Requests

  • Python Sync!!!!1111one

Metrics

Reports and Monitoring (daniel)

Product

Sync

Firefox 6

Firefox 7

Beyond

  • Add-on EOL Plan being finalized.
  • Improve Sync Set Up Process -
    • had an internal usability study on Monday to look at mobile sync set up.
    • Next steps, read out from User Research. Iterate on the proposed changes and lock down UX mock ups and requirements.
  • Update the Sync Road Map page with a better sequence section of engineering tasks and add a Sync Feature Inbox list
  • Working with PMM on updating pages with Sync references
  • Working with Services Support on Sync support content

Security

Marketing

Roundtable

Q3 Goals

Draft: http://lunch.mozilla.org:9000/services-q3-goals

Notes and actions

Follow ups from last week

Other issues