Services/Meetings/2011-12-13
From MozillaWiki
- Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
- Place: Mozilla HQ, North Bridge
- Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
- Phone (Toronto): 416 848 3114 x92 Conf: 8616#
- Phone (US): 800 707 2533 (pin 369) Conf: 8616#
Who's away?: ….
Ops
- All BrowserID all the time.
Engineering
Sagrada
Metrics (Rob)
- cleaned up integration w/ server-core sync code
- proof of concept cornice / demoapp metlog integration
- updated dev installs to new server-core / metlog revisions
- some bumps in the road w/ Hadoop back end, switching to file system output w/ batch job to push into Hadoop
- starting to investigate Cassandra as an alternative to Hadoop
Sauropod (rtilder)
Queuey (bbangert)
Big Lebowski (rtilder)
Sync
Firefox Sync (rnewman)
- Add-on sync awaiting review
Android Sync (rnewman)
Server (TBD)
Account Portal (telliott)
Notifications
WebApp/BrowserID support (BIPostal)
- Added OAuth integration
- Moving storage libraries to shared egg (for both parts of bipostal)
- Talked to Ben about how they plan to connect to BIPostal api
- Loading up BIPostal to dev box.
- schedule security review
- Full integration of SocketLabs is less of a priority right now, still need to bother petef about API calls.
Client/Server (jbalogh)
- Client and Server working, but not pretty
- Next: write tests, move frontend from a webpage to an addon
Beta Channel
Program Launch (mconnor)
QA
Testing and Sign-offs (tracy)
- String change train last week was verified and tested by MihaelaV
- We're in progress sanity checking the Fx channels prior to next weeks release of Fx9
- To discuss testing strategy of Android native sync today
API/FunkLoad Scripts (jrgm)
Sync Server (jbonacci)
- Quiet week on the Sync Server side
- The regular barrage of deployments should start up next week.
- Account Portal!
- MySQL!
BrowserID (jbonacci)
- Successful first big Work Week
- Dev environment has been sanity/stability tested before and after RSBAC changes
- Stage environment has been sanity/stability tested
- Focus this week: Stage
- Test Prod-ready build
- RSBAC changes
- Load Testing
- Debug "all-in-one" installs on various Linux flavors
- Continue to work with Dev and OPs on build-outs for Prod, Test/CI, etc.
TPS (jgriffin/tracy)
- Crunch time to finish Q4 goal for automating 10 sync functional test cases with Mozmill/TPS