Confirmed users
489
edits
| Line 6: | Line 6: | ||
| * 2.2 milestone | * 2.2 milestone | ||
| ** Dev start: 2014-11-24 | ** Dev start: 2014-11-24 | ||
| **  | ** FLRR: 2015-02-09 2 weeks before FL | ||
| ** FL: 2015-02-23 (Gecko 38 will be the base) | ** FL: 2015-02-23 (Gecko 38 will be the base) | ||
| ** FC: 2015-04-06 | ** FC: 2015-04-06 | ||
| Line 12: | Line 12: | ||
| * The bugs filed after CC and reproducible in reference phone should be owned by OS team.   | * The bugs filed after CC and reproducible in reference phone should be owned by OS team.   | ||
| * To join the TAM triage meeting with device team. | * To join the TAM triage meeting with device team. | ||
| = Feature topics = | = Feature topics = | ||
| * 2015 Target features. | * 2015 Target features. | ||