QA/Async Drawing Test Plan: Difference between revisions

Jump to navigation Jump to search
edits
(added spreadsheet link)
(edits)
Line 184: Line 184:
* All test cases should be executed
* All test cases should be executed
* All blockers, critical bugs must be fixed and verified or have an agreed-upon timeline for being fixed (as determined by engineering/RelMan/QA)
* All blockers, critical bugs must be fixed and verified or have an agreed-upon timeline for being fixed (as determined by engineering/RelMan/QA)
== Results ==
'''Aurora testing'''<br />
* TBD on TestRail
'''Merge to Aurora Sign-off'''<br />
List of OSes that will be covered by testing<br />
*Link for the tests run - TBD
** Full Test suite - TBD


== Checklist ==
== Checklist ==
Confirmed users
1,983

edits

Navigation menu