Line 9: Line 9:




'''Next meeting's Agenda Items (1/6/09):'''
'''Next meeting's Agenda Items (1/13/09):'''
* Status of open work items for current release
* Status Updates
* Discuss sprint planning process (Dan Smith)
 




Line 17: Line 17:
= December 16, 2008 Meeting Notes =
= December 16, 2008 Meeting Notes =
== Attendees ==
== Attendees ==
Rick Reitmaier, Dan Schaffer, Dan Smith, Brent Baker, Leslie Lewis, Rob Borcic, Moh (Intel), Tom Harwood, Tom Reilly,  Steven Johnson, Rudolph, Shengnan (Intel)
Dan Schaffer, Dan Smith, Brent Baker, Leslie Lewis, Rob Borcic, Tom Harwood,  Steven Johnson


== Agenda Topics ==  
== Agenda Topics ==  
* Release Update
* Current Release Status
* Next Sprint
* Status Updates
 
== Meeting Discussion Notes ==
=== Current Release Status ===
* December release delayed
* Request from Flex & Player teams on string work and memory profiler changes for performance testing
* Strings not ready yet for release out to TC
* Hold off on releasing current bits from Redux and focus on getting strings stable. This could take a couple of week.
* Decision: Delay December release and work this week to get strings work done
* Other teams can take private builds from Redux if needed
** 469836 – tracking bug for this release. Two dependent bugs:
** Interpreter
** Memory usage problem
 
=== Status Updates ===
Rob Winchell
* No Tamarin related status workin on WinMo
* Working on running ATS on Windows Mobile
* Finding memory problems
* ATS gets further than where we were with Taiko


== Action Items ==
Dan Schaffer
* When we get back on 1/5/09, let’s see where we are with outstanding features and on that day we can pick when we can do the integration. We can plan to do a release the week of 1/5
* Canary perf apps
* Checked in headless player emulator
* Working on a headless version that runs in the shell
* Cleaning up runtests scripts (perf and acceptance tests sharing libraries)
 
Edwin
* Adding a script for running the VM more than once and prints out the differences
** Run all configs on one platform
** If you use ssh cleverly you can probably run all platforms
* Fuzzer
** Differential testing work (see above bullet)
** Driver
** Generates abc – writing a recursive descent grammar
** Reducer – generate an abc that is big and it crashes somewhere you need  a way to get it back down to a normal abc size (NOT Started and probably won’t get to)
* X64 stuff close but not done yet, need another week
 
Brent
* Adding things to buildbot now that arm has jit enabled by default. It is now running interpreter default mix mode and adding a forced jit run. Also a 64 bit machine for mac ppc and intel will be enabled.
* Sun studio compiler has been fixed and a patch will be releases shortly after Xmas. Current blocking issue we have should be fixed in the compiler shortly available.
* Taking on some house cleaning stuff with bugbase so it is easy for us to manage.  
* Tracking work items were not always getting a triage status set, so now all bugs where there is something for Q E to do should be passed to QRB. If it is a dev only bug it will be assigned to triage an d assigned directly to Dev. No changes from the Dev perspective, now QE and management has more visibility into all work items.
 
Trevor
* Scrum planning
* Editing content on MDC
* Tamarin Blog is going to be created (bug open)
** Add a tamarin roadmap for non Adobe folks
* Updates to Tamarin project on Mozilla.org.
** Goals will be a pointer to MDC so we can edit easily
* Upcoming task: Jeff, Peter Donovan, Trevor will review ASC deferred bugs
 
 
Tom Harwood
* Addressing bugs Dan Sch found after running acceptance tests
* Started SCRUM feature summaries
 
Dan Smith
* Scrum process/tracking
* Next Monday kickoff process and start Sprint 1
* Nokia workshop coming up week of 19th, Dan in SF that week


== Meeting Discussion Notes ==
=== Release Update ===
* Should we delay? Status of current work items below:
* X64 (Edwin/Rick)
** Changes for LIR are 80%
** PPC passing many tests
** X64 almost working
** Need some cleanup time
* ARM patches
** still outstanding
** Close but risky for the end of the week
* Out of Memory
** 2 days away from having infrastructure ready for testing
** Approx 1 week of testing
* When we get back on 1/5/09, let’s see where we are with outstanding features and on that day we can pick when we can do the integration. We can plan to do a release the week of 1/5


=== Next Iteration Planning ===
Steven
* Start next iteration on 1/12.
* Narrowing out differences between Tamarin and player
* Grooming product backlog
* Focus on Debugger memory usage and teasing it down, another few more days
* Forming teams
* Security patches okay to push them out
* Ed and Lars will help to groom product backlog
* Strings are still flaky especially on 64 bit builds
** We will need to redo them so they separately allocate string structure. Need to check in with Michael Daumling to see if he can help out. He may  have time to help out. Dan Smith will find out his availability.
** Another short term option is to enable interior pointers as opposed to crashing randomly – Not an optimal suggestion as it will regress performance


=== Global Optimizer (Tom Harwood) ===
Christopher Peyer
* Working with Scott Peterson’s LLVM integration
* Perf Report Page up and running
* In POC point
* Working on threaded run tests
* Tom is turning it into a plug-in for GO, once this is done Tom will add a product backlog for GO and quantify work to get LLVM plugin
* Add GO items to existing Product Backlog
* There is an AS buildbot that runs GO, there are about 300 failures in acceptance tests, performance tests – ratio is about 10% faster, memory 6% lower, abc code about 6% smaller


=== Verifier (Jeff) ===
Jeff
* Going well
* Refactor of verifier complete, need 32 bit builds to pass. Once done need to decide to push into redux. Performance up to par with current redux. Haven’t looked at memory usage yet.
* Patch by end of next week
** Needs help from QE prior to making decision to push
* As soon as there is a release, he would like to have it reviewed and integrated
* Started an ASC backlog (to isolate work items that are specific to ASC, so it can be shared across the Flex SDK team)
* Once it is integrated, he will work on input verifier logic
* Everything that our team is working on should be in our ActionScript Product Backlog


Lars
* Working on bug backlog, release planning




= Older meetings =
= Older meetings =
* [[Tamarin:WeeklyUpdates/2009-01-06|January 6, 2009]]
* [[Tamarin:WeeklyUpdates/2008-12-16|December 16, 2008]]
* [[Tamarin:WeeklyUpdates/2008-12-16|December 16, 2008]]
* [[Tamarin:WeeklyUpdates/2008-12-09|December 9, 2008]]
* [[Tamarin:WeeklyUpdates/2008-12-09|December 9, 2008]]
64

edits

Navigation menu