IT/ChangeControl: Difference between revisions

Jump to navigation Jump to search
Line 52: Line 52:


=== Minor Changes ===
=== Minor Changes ===
Minor Changes needed limited approval because they are limited in scope and shouldn't hold up for a long time waiting for the next meeting.  These Changes require a single CAB member signoff where there's little to no risk and/or impact limited to known scope. 
Approved Minor Changes are to be reported at the next CAB Meeting but the CAB Member who approved the Minor Change.
=== Major Changes ===
=== Major Changes ===
Major Changes require the board in quorum.  The Change Requester (or proxy) will be invited to the CAB Meeting to defend the request/change.  Undefended requests will be deferred.
The CAB will mark the Request:
* will never approved
* Approved
* Pending (require contingencies for the Requester to fullfill (shifting start time, improved rollout/rollback plans).
=== Emergency Changes ===
=== Emergency Changes ===
Emergency/breakfix changes will be handled on an as-needed basis with the primary purpose focused on restoring service. These changes require no pre-authorization.
Mozilla SRE will inform the CAB via email with a short description of the change and the reason for it.
Mozilla SRE will attend the next CAB Meeting to walk through Root Cause Analysis.
Confirmed users, Bureaucrats and Sysops emeriti
1,081

edits

Navigation menu