==Marco== | ==Marco== | ||
* Implement and evaluate V1 Desktop iteration process changes. | * Implement and evaluate V1 Desktop iteration process changes for Iteration 34.2 on Tuesday August 5: | ||
* | ** Generate a median and velocity range based on the previous 5 iterations. | ||
* | ** GMC will prepare a bug list totalling the maximum value (high end production capacity) of the velocity range. | ||
** Team will select bugs up to the minimum value (low end production capacity) of the velocity range. | |||
** Each planning group will have its own production cap based on the specific makeup of the group. | |||
** Planning meeting begins with the review, removal and/or redistribution of carry over work from the previous iteration. | |||
** The remaining point capacity, up to the minimum value of the velocity range, is used for new work on the priority list. | |||
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29: | |||
** Improve the average percentage of committed work from Iterations 34.2 - 35.2 that is verified to 75%. | |||
** Reduce the average percentage of carry over work from Iterations 34.2 - 35.2 that is verified to 25%. | |||
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work. | |||