Program Management/Firefox/2014-Q3-Goals: Difference between revisions

Jump to navigation Jump to search
Line 29: Line 29:


==Marco==
==Marco==
* Implement and evaluate V1 Desktop iteration process changes.  
* Implement and evaluate V1 Desktop iteration process changes for Iteration 34.2 on Tuesday August 5:
* Implement and evaluate using data from only the latest 5 iterations for the median and velocity range.
** Generate a median and velocity range based on the previous 5 iterations.
* '''Note:'''  Further goals will be added based on the implemented V1 Desktop iteration process changes.
** GMC will prepare a bug list totalling the maximum value (high end production capacity) of the velocity range.
** Team will select bugs up to the minimum value (low end production capacity) of the velocity range.
** Each planning group will have its own production cap based on the specific makeup of the group.
** Planning meeting begins with the review, removal and/or redistribution of carry over work from the previous iteration.
** The remaining point capacity, up to the minimum value of the velocity range, is used for new work on the priority list.
* Aim to achieve the following performance gains based on the above mentioned process changes at the conclusion of Iteration 35.2 on September 29:
** Improve the average percentage of committed work from Iterations 34.2 - 35.2 that is verified to 75%.
** Reduce the average percentage of carry over work from Iterations 34.2 - 35.2 that is verified to 25%.
*** The breakdown for the 25% reduction in carry over work aims to be 5% for resolved work awaiting verification and 20% for incomplete Engineering/Design work.