Firefox OS/DeviceQA/2014-10-06WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1"...")
 
m (Lakrits moved page FirefoxOS/DeviceQA/2014-10-06WeeklyReport to Firefox OS/DeviceQA/2014-10-06WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...)
 
(14 intermediate revisions by 11 users not shown)
Line 1: Line 1:
[[FirefoxOS/DeviceQA/2014-09-29WeeklyReport | Last week]] | [[FirefoxOS/DeviceQA/2014-10-15WeeklyReport | Next week]]
[[FirefoxOS/DeviceQA/2014-09-29WeeklyReport | Last week]] | [[FirefoxOS/DeviceQA/2014-10-13WeeklyReport | Next week]]


{| class="wikitable" class="fullwidth-table" border="1"
{| class="wikitable" class="fullwidth-table" border="1"
Line 9: Line 9:
| Al
| Al
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/10):
** Bug 1074612 getUserMedia issues solving
** FC/CC criteria discuss
*** New Testing github Repo at mozilla-b2g
** Africacom support
*** Generate testing cases in excel format to partners
** MCTS study/problem tracking
** Kick off drafting on FC/CC criteria checking list
||
||
* Week W41 (10/06~10/10):
* Week W42 (10/13~10/17):
|-
|-
| Walter
| Walter
||
* Week W40 (09/29~10/03):
** Bug solving for mtbf
** MTBF test runs*3
** review pull requests
||
||
* Week W41 (10/06~10/10):
* Week W41 (10/06~10/10):
Line 29: Line 23:
** combo runner
** combo runner
** db for phone and data
** db for phone and data
||
* Week W42 (10/13~10/17):
|-
|-
| Cynthia
| Cynthia
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/10):
**Take care of Flame KK v2.0 automation reports  
**Take care of Flame KK v2.0 automation reports  
***Bug 1077377 - [v2.0] Investigate test_camera_flash_modes failure
**Run Gaia UI test on Woodduck
***Bug 1077367 - [v2.0] Investigate test_camera_capture_video failure
**Clarify and reproduce Woodduck issues
**Clarify and reproduce Woodduck issues
||
||
* Week W41 (10/06~10/10):
* Week W42 (10/13~10/17):
**Take care of Flame KK v2.0 automation reports  
**Take care of Flame KK v2.0 automation reports  
**Provide Woodduck daily build
**Clarify and reproduce Woodduck issues
**Clarify and reproduce Woodduck issues
|-
|-
| Edward
| Edward
||
* Week W40 (09/29~10/03):
** Smoketest for v2.1 productivity apps with KK build
** B2g perf for productivity of v2.1
** Rewrite test cases of WebRTC and RTSP
** [Media Platform] Test cases modification - getUserMedia
** [Prod] Test/ verify sprint 5 tickets
** 2.1 Feature sharing
||
||
* Week W41 (10/06~10/10):
* Week W41 (10/06~10/10):
** [Prod] Test/ verify sprint 6 tickets  
** [Prod] Test/ verify sprint 6 tickets  
** Smoketest for v2.1 productivity 3rd run
** Smoketest for v2.1 productivity 3rd run
||
* Week W42 (10/13~10/17):
** Productivity - Verify sprint 6 tickets
** Bugs verfification
** Write Marionette js auto scripts.
** Final confirm and trace status of blocking issues in v2.1
|-
|-
|Shing
|Shing
|
||
*Week W40 (09/29~10/03)
*Week W41 (10/6~10/9)
** Cost Control test cases design.
** Cost Control test cases cleanup.
** Read ''Pragmatic Software Testing''.
** Read ''Pragmatic Software Testing''.
** Prepare sharing on how to submit app to Firefox Marketplace.
** Prepared sharing on how to submit app to Firefox Marketplace.
** Cost control 2.1 blockers triage with Marshall (RD).
** Cost Control bugs follow-up.
** Added "export to csv" support for MozTrap ([https://addons.mozilla.org/zh-tw/firefox/addon/moztraphelper/?src=userprofile Addon link])
||
||
*Week W41 (10/6~10/9)
* Week W42 (10/13~10/17):
** Cost Control test cases cleanup.
** Cost Control test cases cleanup.
** Apps usage metrics test cases design.
** Write gaia-ui-test for cost control app.
** Read ''Pragmatic Software Testing''
** Verify cost control and telemetry bugs.
** Sharing on how to submit app to Firefox Marketplace
 
|-
|-
|Askeing
|Askeing
|
* Week W40 (09/29~10/03)
** Investigate the MCTS.
** Develop the flashing tools for MTBF.
** Prepare the information of outsourcing.
** Follow up the Card UI user story.
||
||
* Week W41 (10/6~10/9)
* Week W41 (10/6~10/9)
Line 84: Line 71:
** Prepare the information of outsourcing.
** Prepare the information of outsourcing.
** Follow up the Card UI user story.
** Follow up the Card UI user story.
||
* Week W42 (10/13~10/17):
|-
|-
|Gerry
|Gerry
|
*Week W40 (09/29~10/03)
** Smoketest for v2.1 system platform with KK build.
** App usage metric test cases design.
** 2.1 system platform feature sharing.
** Verify 2.1 bugs.
||
||
*Week W41 (10/6~10/9)
*Week W41 (10/6~10/9)
** Smoketest for v2.1 system platform with KK build.
** Smoketest for v2.1 system platform with KK build.
** Finish app usage metric test cases.
** Create app usage metric test cases.
** Automate test cases for actions on notification
** Verify bugs.
||
* Week W42 (10/13~10/17):
** Create app usage metric test cases.
** Automate test cases for actions on notification
** Review smoke tests for SP & OTA
** Verify bugs.
** Verify bugs.
|-
|-
| Mike
| Mike
||
* Week W40 (09/29~10/03):
**Flame base image verification: v184
**Madai bug verification
**Extend Orangutan capability
**3rd party app performance measurement
||
||
* Week W41 (10/6~10/9)
* Week W41 (10/6~10/9)
Line 111: Line 95:
**Device Team Entry Criteria discussion
**Device Team Entry Criteria discussion
**Arrange discussion of topics against MozTrap Ecosystem
**Arrange discussion of topics against MozTrap Ecosystem
||
* Week W42 (10/13~10/17):
**Flame base image verification
***v188 HW Sanity Test
***Bug works
**Others: 4 days PTO
|-
|-
| Paul
| Paul
||
* Setup device for flame_kk
* Workaround for v2.0 software home button
* Fix test case error
* Patch for reusing marionette instance
* Trigger custom build run for patch 1064800
||
||
* Trigger test run
* Trigger test run
* Fix device test issue for mtbf on tako
* Fix device test issue for mtbf on tako
* day off - 10/8 - 10/9 in Okinawa
* day off - 10/8 - 10/9 in Okinawa
||
* Follow up device/graphic issue
* Prepare Q3 retrospect demo
* Q4 plan
* Check incoming request for flash tool
-- backlog --
-- backlog --
* Followup live test run stream
* Followup live test run stream
Line 131: Line 120:
| eric
| eric
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/09):
** Exploratoy against v2.1
** Exploratoy against v2.1
** Feature page index for OS
** Feature page index for OS
** Verification of bugs before FC
** Verification of bugs before FC
** Reviewing smoke test case
||
||
* Week W41 (10/06~10/09):
* Week W42 (10/13~10/17):
** Exploratoy against v2.1
** Exploratoy against v2.1
** Feature page index for OS
** Verification of bugs
** Verification of bugs before FC
** Fixing SMS/STK test cases
** Fixing SMS/STK test cases
** Reviewing smoke test case
** Reviewing smoke test case
Line 147: Line 134:
| Hubert
| Hubert
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/09):
** Woodduck weekly meeting  
** Woodduck weekly meeting  
** Follow up Woodduck tasks and issues
** Follow up Woodduck tasks and issues
Line 154: Line 141:
** Outsourcing meeting with EPM
** Outsourcing meeting with EPM
||
||
* Week W41 (10/06~10/09):
* Week W42 (10/13~10/17):
** Woodduck weekly meeting
** QA outsource partner training (10/13 ~ 10/18)
** Follow up Woodduck tasks and issues
** Plan outsourcing training items (Document, account...etc)
** Woodduck triage meeting
** Outsourcing meeting with EPM
|-
|-
| William Hsu
| William Hsu
||
||
* '''Week W40 (09/29~10/03)'''
* '''Week W41 (10/06~10/10)'''
** [Routine] 33 bug from the time of the writing of this (Ref: http://goo.gl/1cLSNB)
** [Device] Assist device related tests - Tako
** [Device] Assist device related tests - Tako
*** Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
*** Assign Tako's bugs to developers and stakeholders.
*** Assign Tako's bugs to developers and stakeholders.
*** Weekly meeting with partner (9/30)
*** Executing Gaia UI test on Tako ES2 build (ETA: 10/07)
***# Three-way synchronization (project status)
*** Executing smoketest on Tako ES2 build (ETA: 10/09)
*** Weekly meeting with partner (10/07)
** [Device] Assist device related tests - Flame
** [Device] Assist device related tests - Flame
**# Gaia UI test on v2.0 Build
**# Gaia UI test on v2.0 Build
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
** Others,
** Others,
*** Q3 personal performance review
*** National holiday 10/10
||
||
* '''Week W41 (10/06~10/10)'''
* Week W42 (10/13~10/17):
** [Device] Assist device related tests - Tako
** [Device] Assist device related tests - Tako
*** Assign Tako's bugs to developers and stakeholders.
**# Tako v2.1 Test Plan
*** Executing Gaia UI test on Tako ES2 build (ETA: 10/07)
**# Assign Tako's bugs to developers and stakeholders.
*** Executing smoketest on Tako ES2 build (ETA: 10/09)
**# Executing Gaia UI test on Tako ES2 build (ETA: 10/14)
*** Weekly meeting with partner (10/07)
**# Executing smoketest on Tako ES2 build (ETA: 10/16)
**# Weekly meeting with partner (10/14)
** [Device] Assist device related tests - Flame
** [Device] Assist device related tests - Flame
**# Gaia UI test on v2.0 Build
**# Gaia UI test on v2.0 Build
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
** Others,
**# New Flame base image verification (v186?)
*** National holiday 10/10
**# Answer flame inquiries
|-
|-
| Alison
| Alison
||
* Week W40 (09/29~10/03):
** Reviewing smoke test case
** Bugs verification
||
||
* Week W41 (10/06~10/09):
* Week W41 (10/06~10/09):
** Smoketest for bluetooth v2.1  
** Smoketest for bluetooth v2.1  
** Bugs verification
** Bugs verification
||
* Week W42 (10/13~10/17):
** Bugs verification
** Update DSDS gaia-ui-test case for bug 980757
** Study [SIMalliance] Open Mobile API Test Specification
** Test cases categorization for NFC
|}

Latest revision as of 13:49, 1 February 2015

Last week | Next week

Name Done Plan
Al
  • Week W41 (10/06~10/10):
    • FC/CC criteria discuss
    • Africacom support
    • MCTS study/problem tracking
  • Week W42 (10/13~10/17):
Walter
  • Week W41 (10/06~10/10):
    • Bug solving for mtbf
    • test cases experiments
    • combo runner
    • db for phone and data
  • Week W42 (10/13~10/17):
Cynthia
  • Week W41 (10/06~10/10):
    • Take care of Flame KK v2.0 automation reports
    • Run Gaia UI test on Woodduck
    • Clarify and reproduce Woodduck issues
  • Week W42 (10/13~10/17):
    • Take care of Flame KK v2.0 automation reports
    • Provide Woodduck daily build
    • Clarify and reproduce Woodduck issues
Edward
  • Week W41 (10/06~10/10):
    • [Prod] Test/ verify sprint 6 tickets
    • Smoketest for v2.1 productivity 3rd run
  • Week W42 (10/13~10/17):
    • Productivity - Verify sprint 6 tickets
    • Bugs verfification
    • Write Marionette js auto scripts.
    • Final confirm and trace status of blocking issues in v2.1
Shing
  • Week W41 (10/6~10/9)
    • Cost Control test cases cleanup.
    • Read Pragmatic Software Testing.
    • Prepared sharing on how to submit app to Firefox Marketplace.
    • Cost Control bugs follow-up.
    • Added "export to csv" support for MozTrap (Addon link)
  • Week W42 (10/13~10/17):
    • Cost Control test cases cleanup.
    • Write gaia-ui-test for cost control app.
    • Verify cost control and telemetry bugs.
Askeing
  • Week W41 (10/6~10/9)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.
  • Week W42 (10/13~10/17):
Gerry
  • Week W41 (10/6~10/9)
    • Smoketest for v2.1 system platform with KK build.
    • Create app usage metric test cases.
    • Automate test cases for actions on notification
    • Verify bugs.
  • Week W42 (10/13~10/17):
    • Create app usage metric test cases.
    • Automate test cases for actions on notification
    • Review smoke tests for SP & OTA
    • Verify bugs.
Mike
  • Week W41 (10/6~10/9)
    • 3rd party app performance measurement
    • Madai bug verification
    • Device Team Entry Criteria discussion
    • Arrange discussion of topics against MozTrap Ecosystem
  • Week W42 (10/13~10/17):
    • Flame base image verification
      • v188 HW Sanity Test
      • Bug works
    • Others: 4 days PTO
Paul
  • Trigger test run
  • Fix device test issue for mtbf on tako
  • day off - 10/8 - 10/9 in Okinawa
  • Follow up device/graphic issue
  • Prepare Q3 retrospect demo
  • Q4 plan
  • Check incoming request for flash tool

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
  • Modify crash report patch based on review
eric
  • Week W41 (10/06~10/09):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
  • Week W42 (10/13~10/17):
    • Exploratoy against v2.1
    • Verification of bugs
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
    • Market customization testing
Hubert
  • Week W41 (10/06~10/09):
    • Woodduck weekly meeting
    • Follow up Woodduck tasks and issues
    • Plan outsourcing training items (Document, account...etc)
    • Woodduck triage meeting
    • Outsourcing meeting with EPM
  • Week W42 (10/13~10/17):
    • QA outsource partner training (10/13 ~ 10/18)
William Hsu
  • Week W41 (10/06~10/10)
    • [Routine] 33 bug from the time of the writing of this (Ref: http://goo.gl/1cLSNB)
    • [Device] Assist device related tests - Tako
      • Assign Tako's bugs to developers and stakeholders.
      • Executing Gaia UI test on Tako ES2 build (ETA: 10/07)
      • Executing smoketest on Tako ES2 build (ETA: 10/09)
      • Weekly meeting with partner (10/07)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • Others,
      • National holiday 10/10
  • Week W42 (10/13~10/17):
    • [Device] Assist device related tests - Tako
      1. Tako v2.1 Test Plan
      2. Assign Tako's bugs to developers and stakeholders.
      3. Executing Gaia UI test on Tako ES2 build (ETA: 10/14)
      4. Executing smoketest on Tako ES2 build (ETA: 10/16)
      5. Weekly meeting with partner (10/14)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      3. New Flame base image verification (v186?)
      4. Answer flame inquiries
Alison
  • Week W41 (10/06~10/09):
    • Smoketest for bluetooth v2.1
    • Bugs verification
  • Week W42 (10/13~10/17):
    • Bugs verification
    • Update DSDS gaia-ui-test case for bug 980757
    • Study [SIMalliance] Open Mobile API Test Specification
    • Test cases categorization for NFC