'''AMO 5.0.6 test plan'''




Mocksup: http://people.mozilla.com/~jscott/bandwagon/clearleft/v11/
'''MOCK-UPS/Specs:'''
http://people.mozilla.com/~jscott/bandwagon/clearleft/v11/
 
'''STAGING SERVER:'''
[https://preview.addons.mozilla.org/en-US/firefox/ preview.addons.mozilla.org]
 
Acceptance doc:
?
 
Planned Release date:
 
* Release is currently scheduled for June 2009
 
QA Resources:
 
* Stephen Donner (irc:stephend)
* Krupa Raj (irc:krupa)
 
QA Support Level:Level 1.
 
[https://wiki.mozilla.org/QA/Execution/Web_Testing/Support_Levels See all our Support levels]
 
QA will cover:
 
* Detailed Browser Compatibility testing
* Doctype validation
* Basic Formatting and Appearance
* Link validation
* User interactions
**Need to specify details here         
* JavaScript-disabled testing for: (1/4 day)
**Front page
**Browsing by category
 
Other:
* Accessibility testing-Marco?
* Localization testing-???[May have to involve the Localization community early on]
 
What is out of scope:
 
* Unit Testing
* Performance testing (Load, Volume, Stress)
* White Box testing
* Security testing
 
 
Team needs to help cover:
 
* Verifying copy is correct
* Ensuring that final designs are correct
 
Entry and Exit Criteria:
* Entry criteria:
**Mocks/Specs are made available to the QA team
**QA team has access to staging server
** 5.0.6 features are ready for testing           
 
 
* Exit Criteria
**No crashing bugs.
**All features under the scope of this release are functional.
**All P0 and P1 bugs are either fixed or deferred.
**All P0/P1 fixes are verified by QA and marked as such in Bugzilla.
**QA has verified that the fixes have not caused major regression.
 
Test deliverables:
 
* Test Plan
* Bug reports
* Interim status updates
 
Assumptions and Risk Management:
* Assumptions:
** There is no schedule slippage from development.
**No feature creep.
**QA has the latest specs;QA is always informed of any changes to the project
 
 
* Risks and their management:
**Need to fill information here

Latest revision as of 20:18, 26 August 2016

AMO 5.0.6 test plan


MOCK-UPS/Specs: http://people.mozilla.com/~jscott/bandwagon/clearleft/v11/

STAGING SERVER: preview.addons.mozilla.org

Acceptance doc: ?

Planned Release date:

  • Release is currently scheduled for June 2009

QA Resources:

  • Stephen Donner (irc:stephend)
  • Krupa Raj (irc:krupa)

QA Support Level:Level 1.

See all our Support levels

QA will cover:

  • Detailed Browser Compatibility testing
  • Doctype validation
  • Basic Formatting and Appearance
  • Link validation
  • User interactions
    • Need to specify details here
  • JavaScript-disabled testing for: (1/4 day)
    • Front page
    • Browsing by category

Other:

  • Accessibility testing-Marco?
  • Localization testing-???[May have to involve the Localization community early on]

What is out of scope:

  • Unit Testing
  • Performance testing (Load, Volume, Stress)
  • White Box testing
  • Security testing


Team needs to help cover:

  • Verifying copy is correct
  • Ensuring that final designs are correct

Entry and Exit Criteria:

  • Entry criteria:
    • Mocks/Specs are made available to the QA team
    • QA team has access to staging server
    • 5.0.6 features are ready for testing


  • Exit Criteria
    • No crashing bugs.
    • All features under the scope of this release are functional.
    • All P0 and P1 bugs are either fixed or deferred.
    • All P0/P1 fixes are verified by QA and marked as such in Bugzilla.
    • QA has verified that the fixes have not caused major regression.

Test deliverables:

  • Test Plan
  • Bug reports
  • Interim status updates

Assumptions and Risk Management:

  • Assumptions:
    • There is no schedule slippage from development.
    • No feature creep.
    • QA has the latest specs;QA is always informed of any changes to the project


  • Risks and their management:
    • Need to fill information here