Mozillians/Releases/1.3/January 31 2012: Difference between revisions
< Mozillians | Releases | 1.3
Jump to navigation
Jump to search
No edit summary |
(→Notes) |
||
| Line 8: | Line 8: | ||
=== Notes === | === Notes === | ||
Migrations Update and Release | Migrations Update and Release | ||
* | * Blocked on network flows; NetOps is on it after escalation. | ||
* Will be able to run Larper script and make sure there aren't any errors | |||
Mozillians 1.3 | Mozillians 1.3 | ||
* | * We'll be building features as we go: location, multiple e-mail addresses and admin panel. | ||
* Will wait for design elements to be ready as well as wireframes | |||
* tofumatt's having a hard time working from thailand...and he has malaria. | |||
Latest revision as of 18:48, 31 January 2012
Tuesday Jan 31st 10:30am PDT.
- Vidyo: 370; Conf 9370.
Agenda
- Releasing the Migration Work (tofumatt/davedash)
- Mozillians 1.3 (aakashd)
Notes
Migrations Update and Release
- Blocked on network flows; NetOps is on it after escalation.
- Will be able to run Larper script and make sure there aren't any errors
Mozillians 1.3
- We'll be building features as we go: location, multiple e-mail addresses and admin panel.
- Will wait for design elements to be ready as well as wireframes
- tofumatt's having a hard time working from thailand...and he has malaria.