Unified Telemetry/Status reports/July 17 2015: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(stuff)
Line 1: Line 1:
[https://wiki.mozilla.org/Status_reports/July_10_2015 previous weeks report]
[https://wiki.mozilla.org/Status_reports/July_10_2015 previous weeks report]
placeholder for the weeks report


== Unified Telemetry status report July 17, 2015 ==
== Unified Telemetry status report July 17, 2015 ==
Line 7: Line 5:
=== Overall Project Health ===
=== Overall Project Health ===


Green -  
Green - Team continues to focus on data validation. R41 is new go live target, existing work has been triaged into new milestones.


=== Exec Summary ===
=== Exec Summary ===
Line 52: Line 50:
**  Compare FHR v2 and FHR v4 search, crash, and other fields: https://bugzilla.mozilla.org/show_bug.cgi?id=1179376 -- close agreement for search counts
**  Compare FHR v2 and FHR v4 search, crash, and other fields: https://bugzilla.mozilla.org/show_bug.cgi?id=1179376 -- close agreement for search counts
** Saved-session vs main pings: https://bugzilla.mozilla.org/show_bug.cgi?id=1147395 -- mismatch in about 7% of sessions for one of the metrics investigated
** Saved-session vs main pings: https://bugzilla.mozilla.org/show_bug.cgi?id=1147395 -- mismatch in about 7% of sessions for one of the metrics investigated
* created new milestones for remainder of r40 cycle, triaged bugs into the buckets


=== Planned for Upcoming Period ===
=== Planned for Upcoming Period ===
Line 58: Line 58:
* Uplift final client changes for r40: [https://docs.google.com/spreadsheets/d/1yAJmgCGYyk1d7A41DZa653Z3u2AbH-kDWsO1vPSgbfE/edit?usp=sharing spreadsheet]
* Uplift final client changes for r40: [https://docs.google.com/spreadsheets/d/1yAJmgCGYyk1d7A41DZa653Z3u2AbH-kDWsO1vPSgbfE/edit?usp=sharing spreadsheet]
* Data validation: https://etherpad.mozilla.org/fhr-v4-validation
* Data validation: https://etherpad.mozilla.org/fhr-v4-validation
* Continue working on work in "b5" milestone: http://mzl.la/1FPWuJG
* Targeting 40r9 as next major milestone to have bulk of validation work completed.
Ops
Ops
* Meeting to go over Telemetry tools/microservices production deployment
* Meeting to go over Telemetry tools/microservices production deployment
* Continued work on scaling for release loads
* Continued work on scaling for release loads
QA
* closing bugs
* test suite creation
* finalizing long term QA engagement (softvision engagement, tooling asks for CI loop based testing)
Project Management
Project Management
* create meeting for legal review
* Finish triage of bugs
* follow up with ops and qa
*
* mitigation plan for projects depending on UT
* reassess milestones given schedule adjustment


=== Outstanding requests not yet road mapped into a release ===
=== Outstanding requests not yet road mapped into a release ===

Revision as of 20:06, 16 July 2015

previous weeks report

Unified Telemetry status report July 17, 2015

Overall Project Health

Green - Team continues to focus on data validation. R41 is new go live target, existing work has been triaged into new milestones.

Exec Summary

  • Not uplifting recent send logic changes to Beta (needs more bake time for confidence)
    • Uplifting a few patches around the send-logic ([uplift2], http://bit.ly/1Je45UA) to Aurora as soon as the send-logic impact is verified
    • Remaining client work ([uplift3], http://bit.ly/1TCl4r8) for 41 is manageable and either blocked by info requests or review
  • Working toward data validation milestone on July 30: http://mzl.la/1J2OdZA
  • Pipeline scaling work to be completed by July 30(?)
  • <tools>
  • Ongoing planning on FHR V2/V3 historic pipeline migration link to status here.

Risks/Issues

Description of Risks/Issues State Owner Plan to Resolve/Mitigation Target Date
Data integrity between V2/V4 and V4 internal data consistency Open Brendan/Sam Investigation in progress. Added resources (Sam). https://etherpad.mozilla.org/fhr-v4-validation 7/15
Data continuity across V2/V4 Open Katie/Mark/Trink Mark writing up plan from Whistler; metrics team specifying data sets and reviewing "executive" data set. https://bugzilla.mozilla.org/show_bug.cgi?id=1182684 7/15
Legal review Open BDS/Legal Meeting between groups 8/04
QA sign off (functional, load) Open Stuart Working with QA on creating test cases/test plans 8/04
Operations - data retention requirements Open Travis/Katie Eng team owes ops a doc defining ping types and data retention requirements 8/04
Operations - analysis tools & microservices Open Travis/Mark/Roberto Architecture/Data flow diagram; meeting next Monday (7/13) 8/04
Data loss incident Open mreid/whd/trink Tee server needs to return error status from old or new. Added Ops resources (Daniel Thornton). 7/15
Remote about:healthreport content Open Katie/Georg Made a request to Laura Thomson for help 8/04
Budget, size of UT pings Open Mark/BDS https://bugzilla.mozilla.org/show_bug.cgi?id=1182693 8/04
Analysis difficulty Open Katie/tbd No plan yet, aside from ongoing work on tools 8/04

Accomplished for Last Period


Planned for Upcoming Period

Engineering

Ops

  • Meeting to go over Telemetry tools/microservices production deployment
  • Continued work on scaling for release loads

QA

  • closing bugs
  • test suite creation
  • finalizing long term QA engagement (softvision engagement, tooling asks for CI loop based testing)

Project Management

  • Finish triage of bugs

Outstanding requests not yet road mapped into a release

Description State Owner Plan to Resolve/Mitigation Target Date
FireFox OS - app pings Open Katie Need to schedule and understand impact on project TBD
histograms for loop/hello Open Katie Need to schedule and understand impact on project TBD

Important Links/References