B2G/Meeting/2016-06-07: Difference between revisions

From MozillaWiki
< B2G‎ | Meeting
Jump to navigation Jump to search
(Page generated from https://public.etherpad-mozilla.org/p/b2g-weekly-meeting by Special:ImportFromEtherpad)
 
(Formatting)
Line 6: Line 6:
* Notes copied to the wiki each week [[B2G/Meeting]]
* Notes copied to the wiki each week [[B2G/Meeting]]
* Meeting time: Tuesday, 9am Pacific
* Meeting time: Tuesday, 9am Pacific
<br />
 
== Announcements ==
== Announcements ==


<br />
 
== Status Updates ==
== Status Updates ==


=== Code Transition ===
=== Code Transition ===


Upgrading to C++11 so we can keep B2G building
Upgrading to C++11 so we can keep B2G building
Line 20: Line 19:
* Bug 1274295 - Meta blockers for merging pine to m-c
* Bug 1274295 - Meta blockers for merging pine to m-c
* Bug 1252482 - Testing / Build Related Tasks
* Bug 1252482 - Testing / Build Related Tasks
<br />
 
=== Porting ===<br />
=== Porting ===


Fairphone 2 build still blocked, Novski need some help to apply the patch
Fairphone 2 build still blocked, Novski need some help to apply the patch
Line 28: Line 27:
WIP port for Xperia Z2 tablet
WIP port for Xperia Z2 tablet
Ownership status of [https://github.com/cm-b2g https://github.com/cm-b2g] is in pending.
Ownership status of [https://github.com/cm-b2g https://github.com/cm-b2g] is in pending.
<br />
=== Infrastructure ===


=== Documentation ===<br />
=== Documentation ===


Working session last Thursday: [https://github.com/mozilla-b2g/B2GOS-community/issues/19 https://github.com/mozilla-b2g/B2GOS-community/issues/19]
Working session last Thursday: [https://github.com/mozilla-b2g/B2GOS-community/issues/19 https://github.com/mozilla-b2g/B2GOS-community/issues/19]
Line 40: Line 37:
* [[B2G/Transition_Project]] will no longer be the &quot;root page&quot; &gt; but still available, to have an history of the transition phase
* [[B2G/Transition_Project]] will no longer be the &quot;root page&quot; &gt; but still available, to have an history of the transition phase
Current main page on wiki [[B2G]]
Current main page on wiki [[B2G]]
<br />
 
=== Governance ===<br />
=== Governance ===


* Alberto Pastor was appointed as a new dialer peer
* Alberto Pastor was appointed as a new dialer peer
* Started updating &amp; pruning the modules list, will migrate the page so that it reflects the new name of the project
* Started updating &amp; pruning the modules list, will migrate the page so that it reflects the new name of the project
<br />
 
=== Communications ===<br />
=== Communications ===


Call for contribution
Call for contribution
Line 53: Line 50:
A list of translators is (almost) done - to easily contact them later if needed: [[B2G/Transition_Project/Working_Groups]]
A list of translators is (almost) done - to easily contact them later if needed: [[B2G/Transition_Project/Working_Groups]]
Manifesto: [Lapineige] I still have to write my proposal
Manifesto: [Lapineige] I still have to write my proposal
<br />
 
=== Smartphone ===
=== Smartphone ===


Dialer can make and receive calls, but only if the dialer is open
Dialer can make and receive calls, but only if the dialer is open
* Bug 1277836 - Incoming calls are not received if the Dialer is not open
* Bug 1277836 - Incoming calls are not received if the Dialer is not open
<br />
 
=== Smart TV ===<br />
=== Smart TV ===
 
[[Firefox_OS/Smart_TV]]
[[Firefox_OS/Smart_TV]]


Line 74: Line 71:
Feature Complete: 15th July 2016
Feature Complete: 15th July 2016
Code Complete: 1st September 2016
Code Complete: 1st September 2016
<br />
 
=== Tablet ===<br />
=== Tablet ===
[[Connected_Devices/Projects/Project_Tablet]]
[[Connected_Devices/Projects/Project_Tablet]]


Line 85: Line 82:
* Designing a user study [https://docs.google.com/document/d/1s6cpRldwbJZifxxrB65iBzHihrcMcteAyFIuu5x_8b0/edit?usp=sharing https://docs.google.com/document/d/1s6cpRldwbJZifxxrB65iBzHihrcMcteAyFIuu5x_8b0/edit?usp=sharing]
* Designing a user study [https://docs.google.com/document/d/1s6cpRldwbJZifxxrB65iBzHihrcMcteAyFIuu5x_8b0/edit?usp=sharing https://docs.google.com/document/d/1s6cpRldwbJZifxxrB65iBzHihrcMcteAyFIuu5x_8b0/edit?usp=sharing]
* We plan to use the Sony Xperia Z2 tablet for the prototype, porting in progress
* We plan to use the Sony Xperia Z2 tablet for the prototype, porting in progress
<br />
 
== Round Table ==
== Round Table ==


question from telegram group (Sai Karthik Karra): who holds the admin rights for github.com/cm-b2g
question from telegram group (Sai Karthik Karra): who holds the admin rights for github.com/cm-b2g
Line 103: Line 99:
* Status of B2G OS, the working groups, and call for action
* Status of B2G OS, the working groups, and call for action
* Reach out to Marvin Khoo to see if marketing can help
* Reach out to Marvin Khoo to see if marketing can help
-------------&gt;8--- TEMPLATE ---8&lt;------------
'''B2G Weekly Meeting'''
* Date: 0000-00-00
* Host:
* Notes copied to the wiki each week [[B2G/Meeting]]
* Meeting time: Tuesday, 9am Pacific
<br />
== Announcements ==
<br />
== Status Updates ==
=== Code Transition ===
=== Porting ===
=== Infrastructure ===
=== Documentation ===
=== Governance ===
=== Communications ===
=== Smartphone ===
=== Smart TV ===
=== Tablet ===
<br />
== Round Table ==<br />

Revision as of 16:37, 7 June 2016

B2G Weekly Meeting


  • Date: 2016-06-07
  • Host: Ben Francis
  • Notes copied to the wiki each week B2G/Meeting
  • Meeting time: Tuesday, 9am Pacific

Announcements

Status Updates

Code Transition

Upgrading to C++11 so we can keep B2G building

  • Bug 1276927 - Build B2G with modern C++11 compiler and STL

Remaining blockers preventing pine merge into m-c (hoping to land them today)

  • Bug 1274295 - Meta blockers for merging pine to m-c
  • Bug 1252482 - Testing / Build Related Tasks

Porting

Fairphone 2 build still blocked, Novski need some help to apply the patch Jovan worked on b2g installer signing bugs, 1 is currently reviewed

  • (thanks Jovan !)

WIP port for Xperia Z2 tablet Ownership status of https://github.com/cm-b2g is in pending.

Documentation

Working session last Thursday: https://github.com/mozilla-b2g/B2GOS-community/issues/19 The FAQ need some review : B2G/Transition_Project/FAQ

MDN page has been change to remove the "transition phase" status Change will be done on the wiki too after transition meeting

  • B2G/Transition_Project will no longer be the "root page" > but still available, to have an history of the transition phase

Current main page on wiki B2G

Governance

  • Alberto Pastor was appointed as a new dialer peer
  • Started updating & pruning the modules list, will migrate the page so that it reflects the new name of the project

Communications

Call for contribution now translated in 6 languages, with the addition of Korean last week

  • Spanish translation almost done

A list of translators is (almost) done - to easily contact them later if needed: B2G/Transition_Project/Working_Groups Manifesto: [Lapineige] I still have to write my proposal

Smartphone

Dialer can make and receive calls, but only if the dialer is open

  • Bug 1277836 - Incoming calls are not received if the Dialer is not open

Smart TV

Firefox_OS/Smart_TV


Working on 2.6 branches

All 2.6 major feature completed: (TV_2.6#FxOs_2.6_TV_key_features)

  • Remote Control
  • Enhanced browser UI
  • Smart Folder

Tracked by meta bug in Bugzilla bug 1253245 Feature Complete: 15th July 2016 Code Complete: 1st September 2016

Tablet

Connected_Devices/Projects/Project_Tablet


Round Table

question from telegram group (Sai Karthik Karra): who holds the admin rights for github.com/cm-b2g

  • Maybe ask gerard-majax on IRC? Or Adam?

Do we want to support more CM ports?

  • Yes. Has some breakage, need people to work on this

Who is now working on the telephony porting? I would like to help

(Final) Monthly transition meeting: Thursday the 9th