L10n:Planning/2011-10-17: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 69: Line 69:


=== Matjaž ===
=== Matjaž ===
'''goal for this week''':
planned for this week:
planned for this week:
*
* Enable Pontoon for all pages
* Pontoon authentication: Mozilla LDAP
done last week:
done last week:
*
* Pontoon: iFrame XSS bugfixes
* Pontoon: explore multipage website scenarios
* Pontoon: start LDAP authentication (Django, BrowserID)
 
=== Milos ===
=== Milos ===
'''goal for this week''':
'''goal for this week''':

Revision as of 14:58, 17 October 2011


Meeting Details

  • Time and location: Monday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel

« previous meetingindexnext week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.

Action Items

carry-overs


Roundtable

chofmann

goal for this week:

planned for this week:

done last week:

gandalf

goal for this week:

planned for this week:

done last week:

Jeff

Goal for this week: Create at least 2 info models for the MDN wiki doc. Complete all corrections for existing doc.

Planned for this week:

  • Complete all corrections for existing doc.
  • Create survey in SurveyMonkey and send out via l10n newsgroup.
  • Create info models prior to receiving survey back based on target audience(s). Make adjustments according to survey results.
  • Follow up with Colombian locale team to learn about their progress and challenges using the existing doc.

Done last week:

  • Finished build staging and created Firefox and language pack builds via Terminal.
  • Began taking screenshots of Narro 2.0 to replace those of Narro 1.0 on Localizing with Narro.
  • Created l10n documentation inventory on delicious.
  • Drafted l10n doc survey for distribution among the communities. Survey will aid in the planning of new information models for new wiki doc.
  • Made plans with arky on existing doc corrections needed.
  • Added "Documentation" as a product component on Bugzilla to track the progress of any reported doc innaccuracies.
  • Made travel arrangements for MozCamp.

Matjaž

planned for this week:

  • Enable Pontoon for all pages
  • Pontoon authentication: Mozilla LDAP

done last week:

  • Pontoon: iFrame XSS bugfixes
  • Pontoon: explore multipage website scenarios
  • Pontoon: start LDAP authentication (Django, BrowserID)

Milos

goal for this week:

planned for this week:

done last week:

Pascal

goal for this week: Debeta one locale, get 2 new localizers active

planned for this week:

  • Look for volunteers for Finish and another locale to be determined
  • List needs for new localizers for AMO and prioritize my outreach to that (I want to find a dedicated person to AMO per locale)
  • Review csb, bs, mn web parts to unblock their beta locale status for Fx8
  • Write a blog post about how I got involved in Mozilla (done)

done last week:

  • Released State of Mozilla mini-site in 13 locales
  • Went to Paris Web conferences
  • Prepared a translation for a snippet for the launch of the new Firefox affiliate site
  • Started looking for localizers for Slovak and Finnish (found 2 volunteers for Slovak that I directed to Vlado)
  • Some outreach to localizers a bit behind on mozilla.org translations asking if they need help finding new people
  • Worked with French community on redistributing web l10n tasks among them
  • Kept working with my new Persian web l10n localizer, Arash.
  • Made some technical changes to webdashboard to be faster and serve more static pages because Narro was taking all the CPU cycles on the server
  • (also upgraded to Ubuntu 11.10 and compiled SVN 1.7 and Geany 0.21 which offer lots of nice features and productivity enhancements :) )

Pike

goal for this week:

planned for this week:

done last week:

stas

goal for this week:

planned for this week:

done last week: