Gaia/SMS/Scrum/FxOS-S4: Difference between revisions

From MozillaWiki
< Gaia‎ | SMS‎ | Scrum
Jump to navigation Jump to search
(/* Remaining points and burndown chart)
Line 78: Line 78:
== Daily meetings ==
== Daily meetings ==
=== Day 2: 29th July ===
=== Day 2: 29th July ===
====Steve====
* {{Bug|1184865}} - [Messages][NG] Replace some methods in MessageManager with messaging service in conversation view.
** Polish the patch and adding the tests/desktop mock
* {{Bug|1179628}} - [Messages][NG] Lay out Settings service structure
** Start mozMobileConnections.
* {{Bug|1180592}} - [Messages][NG] mozMobileConnections shim Implementation
** Layout for mozMobileConnections shim first.
*  {{Bug|1167144}} -  [Messages] Reduce the use of Threads.active and Threads.currentId in conversation view
** Update for the latest suggestions.
Today:
* Layout for mozConnections shim
* Figure out the problem in messaging service and profiling.
* Review Julien's navigation patch
====Julien====
* Hackday event
====Oleg====
* Hackday event
=== Day 3: 30th July ===
=== Day 3: 30th July ===
=== Day 4: 31st July ===
=== Day 4: 31st July ===

Revision as of 08:24, 29 July 2015

List of bugs

SMS issues handled by the SMS subteam (blocks the sprint bug 1188768)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
1162030 Julien Wajsberg [:julienw] [Messages][NG] Figure out how navigation works --- No cf_feature-b2g [p(FxOS-S4)=2][p(FxOS-S3=3][p(2.2S13)=2][sms-sprint-2.2S14] FIXED
1169576 Oleg Zasypkin [:azasypkin] [Messages][NG] Implement Conversation service: method for streaming joined threads and drafts list --- No cf_feature-b2g [p(FxOS-S5)=3][p(FxOS-S4)=3][p(FxOS-S3)=3] FIXED
1184865 Steve Chung [:steveck] [Messages][NG] Replace some methods in MessageManager with messaging service in conversation view --- No cf_feature-b2g [p(FxOS-S5)=1][p(FxOS-S4)=2][sms-sprint-FxOS-S5] FIXED

3 Total; 3 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Remaining points and burndown chart

google chart api url for Sprint FxOS-S4

Burndown chart
Remaining points
Start 7
Day 2 7
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
End


SMS issues handled by the SMS subteam outside of the sprint (contains whiteboard "sms-sprint-FxOS-S4")

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
1176976 Oleg Zasypkin [:azasypkin] [Messages][Drafts] Remove the draft saving/replacing action menu --- No cf_feature-b2g [sms-sprint-FxOS-S8 p=1][sms-sprint-FxOS-S3][sms-sprint-FxOS-S4] FIXED
1190275 Julien Wajsberg [:julienw] [Messages] Image attachments are not showing up properly when going to a subview and coming back --- No cf_feature-b2g [sms-sprint-FxOS-S4] FIXED
1190276 Julien Wajsberg [:julienw] [Messages] In a "new" activity we don't keep the body if the phone number has a conversation already --- No cf_feature-b2g [sms-sprint-FxOS-S4] FIXED

3 Total; 3 Open (100%); 0 Resolved (0%); 0 Verified (0%);


All SMS issues tracked for this sprint (target milestone)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature b2g Resolution
1188768 SMS sprint FxOS-S4 --- --- INCOMPLETE

1 Total; 1 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Sprint planning

Minutes are on a separate page.

Daily meetings

Day 2: 29th July

Steve

  • bug 1184865 - [Messages][NG] Replace some methods in MessageManager with messaging service in conversation view.
    • Polish the patch and adding the tests/desktop mock
  • bug 1179628 - [Messages][NG] Lay out Settings service structure
    • Start mozMobileConnections.
  • bug 1180592 - [Messages][NG] mozMobileConnections shim Implementation
    • Layout for mozMobileConnections shim first.
  • bug 1167144 - [Messages] Reduce the use of Threads.active and Threads.currentId in conversation view
    • Update for the latest suggestions.

Today:

  • Layout for mozConnections shim
  • Figure out the problem in messaging service and profiling.
  • Review Julien's navigation patch

Julien

  • Hackday event

Oleg

  • Hackday event

Day 3: 30th July

Day 4: 31st July

Day 5: 3rd August

Day 6: 4th August

Day 7: 5th August

Day 8: 6th August

Day 9: 7th August

Day 10: 10th August

Demos

Retrospective