Gaia/SMS/Scrum/Template: Difference between revisions
Jump to navigation
Jump to search
Full Query
Steveck324 (talk | contribs) (Undo revision 1087033 by Steveck324 (talk)) |
Steveck324 (talk | contribs) (Undo revision 1087030 by Steveck324 (talk)) |
||
| Line 81: | Line 81: | ||
== Sprint planning == | == Sprint planning == | ||
Minutes are [[Gaia/SMS/Scrum/ | Minutes are [[Gaia/SMS/Scrum/<SPRINT>/Planning|on a separate page]]. | ||
== Daily meetings == | == Daily meetings == | ||
Revision as of 08:27, 29 July 2015
Replace:
- <BUG> by the bug number for this sprint
- <SPRINT> by the sprint name (eg: 2.1S1)
- <MILESTONE> by the sprint name in the target milestone property (eg: 2.1 S1 (1aug))
- <MILESTONE_URL> by the sprint name in the target milestone property, url-escaped (eg: 2.1%20S1%20%281aug%29)
- <POINTS> by the points taken for this sprint
List of bugs
SMS issues handled by the SMS subteam (blocks the sprint bug 1188765)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Remaining points and burndown chart
google chart api url for Sprint FXOS-S4
| Remaining points | |
|---|---|
| Start | 7 |
| Day 2 | |
| Day 3 | |
| Day 4 | |
| Day 5 | |
| Day 6 | |
| Day 7 | |
| Day 8 | |
| Day 9 | |
| Day 10 | |
| End |
SMS issues handled by the SMS subteam outside of the sprint (contains whiteboard "sms-sprint-FXOS-S4")
| ID | Assigned to | Summary | Blocking b2g | Feature-b2g | Whiteboard | Resolution |
|---|---|---|---|---|---|---|
| 1176976 | Oleg Zasypkin [:azasypkin] | [Messages][Drafts] Remove the draft saving/replacing action menu | --- | No cf_feature-b2g | [sms-sprint-FxOS-S8 p=1][sms-sprint-FxOS-S3][sms-sprint-FxOS-S4] | FIXED |
| 1190275 | Julien Wajsberg [:julienw] | [Messages] Image attachments are not showing up properly when going to a subview and coming back | --- | No cf_feature-b2g | [sms-sprint-FxOS-S4] | FIXED |
| 1190276 | Julien Wajsberg [:julienw] | [Messages] In a "new" activity we don't keep the body if the phone number has a conversation already | --- | No cf_feature-b2g | [sms-sprint-FxOS-S4] | FIXED |
3 Total; 3 Open (100%); 0 Resolved (0%); 0 Verified (0%);
All SMS issues tracked for this sprint (target milestone)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Sprint planning
Minutes are [[Gaia/SMS/Scrum/<SPRINT>/Planning|on a separate page]].
