L10n:Weekly/2013-01-16: Difference between revisions
(Created page with "{{SUBPAGENAME}} {{SUBPAGENAME}} __NOTOC__ ==Meeting Details== * Time and location: Wednesday, 8 AM PST, conf bridge ...") |
|||
| Line 147: | Line 147: | ||
=== Other engagement projects === | === Other engagement projects === | ||
* Firefox Flicks 2013 l10n started today, Milos merged the strings and pascal filing bugs and doing the outreacdh | |||
=== Labs === | === Labs === | ||
Revision as of 16:09, 16 January 2013
Meeting Details
- Time and location: Wednesday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting —
index –
next week »
create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
Action Items
carry-overs
New locales updates
Aragonese (an)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Azerbaijan (az)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Burmese (my)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Luganda (lg)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Malay (ms)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Occitan (oc)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Samoan (sm)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Urdu (ur)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Wolof (wo)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Project updates
Mozilla.org
AMO
MDN
SUMO
QA
Other engagement projects
- Firefox Flicks 2013 l10n started today, Milos merged the strings and pascal filing bugs and doing the outreacdh