Gaia/SMS/Scrum/2.1S4

From MozillaWiki
< Gaia‎ | SMS‎ | Scrum
Revision as of 09:18, 2 September 2014 by Steveck324 (talk | contribs) (Created page with "== List of bugs == <onlyinclude> === SMS issues handled by the SMS subteam (blocks the sprint {{bug|1055470}}) === [https://bugzilla.mozilla.org/buglist.cgi?f1=blocked&o1=subs...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

List of bugs

SMS issues handled by the SMS subteam (blocks the sprint bug 1055470)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
1035762 Oleg Zasypkin [:azasypkin] [B2G][SMS] support 24 hour time format --- No cf_feature-b2g [p=1] FIXED
1041765 Oleg Zasypkin [:azasypkin] [Messages] Thread view redesign --- No cf_feature-b2g [p=2] FIXED
1048841 Steve Chung [:steveck] [Messages] investigate performance hit from IndexedDB at startup (eg: Contact lookup) --- No cf_feature-b2g [p(2.1S3)=1][p(2.1S2)=2][c=startup p= s= u=] WONTFIX

3 Total; 3 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Remaining points and burndown chart

google chart api url for Sprint 2.1S4

Burndown chart
Remaining points
Start
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
End


SMS issues handled by the SMS subteam outside of the sprint (contains whiteboard "sms-sprint-2.1S4")

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
1053964 Oleg Zasypkin [:azasypkin] [Messages][Tests] Add marionette JS test case to verify close\back button behaviour when app is in activity mode --- No cf_feature-b2g [sms-most-wanted][sms-sprint-2.1S4] FIXED
1063970 Oleg Zasypkin [:azasypkin] [Messages][Refresh] Update styles of phone and url links located inside messages --- No cf_feature-b2g [sms-sprint-2.1S4] FIXED

2 Total; 2 Open (100%); 0 Resolved (0%); 0 Verified (0%);


All SMS issues tracked for this sprint (target milestone)

Bugzilla link

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


Sprint planning

Minutes are on a separate page.

Daily meetings

Day 2: 3rd September

Day 3: 4st September

Day 4: 5th September

Day 5: 8th September

Day 6: 9th September

Day 7: 10th September

Day 8: 11th September

Day 9: 12th September

Day 10: 15th September

Demos

Retrospective