Gaia/SMS/Scrum/FxOS-S7

From MozillaWiki
< Gaia‎ | SMS‎ | Scrum
Revision as of 03:44, 9 September 2015 by Steveck324 (talk | contribs) (Created page with "Replace: * 1202956 by the bug number for this sprint * FxOS-S7 by the sprint name (eg: 2.1S1) * FxOS-S7 (21Sep) by the sprint name in the target milestone property (eg: 2.1 S1...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Replace:

  • 1202956 by the bug number for this sprint
  • FxOS-S7 by the sprint name (eg: 2.1S1)
  • FxOS-S7 (21Sep) by the sprint name in the target milestone property (eg: 2.1 S1 (1aug))
  • FxOS-S7%20%2818Sep%29 by the sprint name in the target milestone property, url-escaped (eg: 2.1%20S1%20%281aug%29)
  • 8 by the points taken for this sprint

List of bugs

SMS issues handled by the SMS subteam (blocks the sprint bug 1202956)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature-b2g Whiteboard Resolution
818000 Julien Wajsberg [:julienw] system messages are ignored if the handler pathname is not the same as the foreground application pathname --- No cf_feature-b2g [sms-sprint FxOS-S7 p=3][sms-sprint FxOS-S6 p=2][sms-sprint FxOS-S5 p=3] WONTFIX
1180592 Steve Chung [:steveck] [Messages][NG] mozMobileConnections shim Implementation --- No cf_feature-b2g [sms-sprint FxOS-S7 p=1][sms-sprint FxOS-S6 p=2] FIXED
1198266 [Messages] Use ConversationService in the application --- No cf_feature-b2g [sms-sprint FxOS-S8 p=1][sms-sprint FxOS-S7 p=3][sms-sprint FxOS-S6 p=2] WONTFIX
1201016 [Messages][NG] Migrate the current Message manager event handling to NGA --- No cf_feature-b2g [sms-sprint FxOS-S8 p=1][sms-sprint FxOS-S7 p=1] WONTFIX

4 Total; 4 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Remaining points and burndown chart

google chart api url for Sprint FxOS-S7

Burndown chart
Remaining points
Start 8
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
End


SMS issues handled by the SMS subteam outside of the sprint (contains whiteboard "sms-sprint-FxOS-S7")

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


All SMS issues tracked for this sprint (target milestone)

Bugzilla link

Full Query
ID Assigned to Summary Blocking b2g Feature b2g Resolution
1184012 Stéphane Roucheray [Messages] Throttle event handlers for the "input" event handlers --- --- FIXED
1202956 SMS sprint FxOS-S7 --- --- INCOMPLETE

2 Total; 2 Open (100%); 0 Resolved (0%); 0 Verified (0%);


Sprint planning

Minutes are on a separate page.

Daily meetings

Day 2: 9th September

Day 3: 10th September

Day 4: 11th September

Day 5: 14th September

Day 6: 15h September

Day 7: 16th September

Day 8: 17th September

Day 9: 18th September

Day 10: 21st September

Demos

Retrospective