Support/Goals/2011Q3/Fx Features
< Support | Goals/2011Q3
Jump to navigation
Jump to search
A page to track the progress of these features.
Fix Profile
- [DONE] 2011-07-15 Figure out how to get planning started
- Asa said he'll push this in the triage meeting tomorrow. I let him know that I'll be available to help get anything done or arrange anything that needs to be arranged to keep things on track for landing this quarter.
- [NEW] 2011-07-29 Complete planning
- 2011-08-05 Asa says they are looking for an engineer to take this on.
- [NEW] 2011-08-30 Complete development
- [NEW] 2011-09-26 Land in Nightly (Firefox 9)
Broken installs
- [DONE] 2011-07-15 Meet with engineering to re-define plan.
- [NEW] 2011-07-29 Get script from Rob Strong and begin collecting data.
- 2011-08-04 Rob Strong says the script will be done no later than 08-09-2011
- [NEW] 2011-08-30 Complete collecting data and determine next steps.
Clear Cookies & Cache
- [DONE] 2011-07-22 Meet with UX to get input on defining the feature
- [NEW] 2011-07-22 Meet with Engineering to get input on defining the feature
- [DONE] 2011-07-29 Define the feature and create a feature page
- [NEW] 2011-08-12 Meet with UX and Engineering to get input on feature design
- [NEW] 2011-09-13 Complete feature design
- [NEW] 2011-09-26 Complete feature planning
Help when Fx can't connect
- [NEW] 2011-07-22 Meet with UX to get input on defining the feature
- [NEW] 2011-07-22 Meet with Engineering to get input on defining the feature
- [NEW] 2011-07-29 Define the feature and create a feature page
- [NEW] 2011-08-12 Meet with UX and Engineering to get input on feature design
- [NEW] 2011-09-13 Complete feature design
- [NEW] 2011-09-26 Complete feature planning