L10n:Planning/2012-03-05

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Meeting Details

  • Time and location: Monday, 8 AM PST, conf bridge 206
  • irc.mozilla.org #l10n-drivers for back-channel

« previous meetingindexnext week » create?

Previous Action Items

carry-overs


Meeting Notes

  • Notetaker:
  • Attendees:
  • Put your talking points here.
  • Contract with Dwayne
  • goals
  • l20n with b2g/jetpack. see also the feature list

Action Items

carry-overs


Roundtable

arky

goal for this week:

planned for this week:

done last week:

chofmann

goal for this week:

planned for this week:

done last week:

gandalf

goal for this week:

Update the python parser to work with new features

planned for this week:

  • Work on new features with Pike and Stas
  • Update the grammar and python parser to work with the new features

done last week:

  • finalize the list of new features for L20n
  • update pyast to support tree dumping
  • initialize work on the toolchain for l20n
  • work with fantasai on LOL syntax improvements

Jeff

goal for this week:

planned for this week:

  • Blog post on fixing small L10n bugs (see l10n blog post schedule).
  • Draft intermediate Narro tutorial.
  • Make edits to process documentation on wikimo.
  • Finish tools vision testing analysis.
  • Q2 goals

done last week:

  • Finished translator recruiting for MozCamp LATAM.
  • Began intermediate and advanced Narro tutorials.
  • Prepared presentation for next week's career fair.
  • Spent most of last week sick with flu.

Matjaž

goal for this week:

planned for this week:

done last week:

Milos

goal for this week: Get progress in LSV updating Educate Ibrahima(ff) on HG

planned for this week:

  • LSV updating
  • Affiliates new process implementation
  • Flicks update and reaching-out
  • Blogging
  • Old-beta style locales: figure out trending since Firefox 4

done last week:

  • Productization
  • Firefox Flicks Release(yay!)
  • Affiliates l10n process rewrite

Status on beta:

  • Acholi: San James is not responding in bugs, but deferring to Dwayne
  • Burmese: no response since landing
  • Ligurian looks good for de-beta, Axel to double-check and review sign-off
  • Fulah: Had problems finding a right time to catch up with Ibrahima
  • Wolof: No response

Pascal

goal for this week:

planned for this week:

  • Prepare the excel file for EUBallot with the translated strings

done last week:

  • put a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change.
  • gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created)
  • Launched translation of a new snippet to promote Firefox Flicks on about:home
  • Created ESR pages for German
  • Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate
  • Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation)
  • Kept working on Beta pages, 47 locales done

Pike

planned for this week:

  • mercurial 2.1 support for the dashboard
  • help elmo ship
  • prepare for merge day

done last week:

  • loads of reviews following up to outreach
  • investigated outdated ldap accounts. Too many

stas

goal for this week:

planned for this week:

done last week: